Will Havaray relax the traffic in Istanbul?

Will Havaray relieve Istanbul traffic: Istanbul Metropolitan Municipality announced its new projects to ease Istanbul traffic in the last days of 2014. Havaray line, which can be completed in 2015, if the construction tender is completed by May. Halkalı Massive housing, Sefaköy and Başakşehir intense populated 3 settlement will take a comfortable breath.

The most striking of these were the new Havaray lines. Completing the preliminary preparations for two havaray lines on both sides of Istanbul, the municipality announced that work has been initiated for 8 new lines.

Two of the Havaray lines were tendered

The lines whose preliminary works were completed were the D-100-Beach line and the Küçükçekmece-Başakşehir line in Tuzla. After the zoning plans were completed, the preparations of these two lines were finalized. Küçükçekmece-Başakşehir line stood out with the number of populations it appeals to and the housing projects that will be affected on the route. The project is about to be completed and construction tender is expected to be made in the coming months.

Küçükçekmece-Halkalı- Başakşehir Line

There will be a total of 11,6 stations on the 16 km Havaray line. The start of the line will be from the Sefaköy stop of the existing metrobus line. The Bakırköy Beylikdüzü Metro, the construction of which will start in the near future, will be linked to this line. Havaray line that will cross Sefaköy all along Halkalı Continue along the street Halkalı It reaches the square. The line, which will pass through permanent settlements, will pass through Fatih Caddesi (Sakarya Street) Köprülü Crossroad and reach Atakent 1st Stage 1st Region. From Hürriyet Caddesi Köprülü Intersection again Halkalı The Havaray line, which goes to the street and continues to the north, will pass in front of the Arenapark Shopping Mall and IETT İkitelli Bus Park areas. Basak City 1 will cross the Tem highway. It will end in front of Etap junction and Başak Residences Metro Station.

Havaray will fly where he passed

Investors in the region are eagerly awaiting the basin line, which is planned to make the Basaksehir and the new Bahçeşehir Metros, as well as other metro lines alongside the Metrobüs line. Because the region's most important problem is known to be transportation. Nevertheless, it is stated that the prices in the region, which makes a very good premium in housing projects, can be made to fly together with the air.

Be the first to comment

Leave a response

Your email address will not be published.


*