Step by step with numbers Kabataş-Mahmutbey metro line

Another metro line is coming: Istanbul Metropolitan Municipality is adding a new one to the subway transportation infrastructure works. KabataşThe construction of Mecidiyeköy-Mahmutbey metro, the first phase of the Mahmutbey metro line, has started.

Mecidiyeköy-Mahmutbey metro, which is an important line in public transportation, will serve 70 thousand citizens per hour. The line, which will join with other metro lines, will make public transportation fast, convenient and comfortable on 2/4 of the European side. When the metro is put into service, the distance between Mahmutbey-Mecidiyeköy will be reduced to 26 minutes.

ETAP ETAP METRO

  1. ETAP
    MECİDİYEKÖY -MAHMUTBEY METRO LINE
    LENGTH: 18 KM
    PASSENGER CAPACITY: 70 THOUSAND (SINGLE DIRECTION / S)
    DISTRICTS OF THE BAGS Şişli-Kağıthane-Eyüp-Gaziosmanpaşa-Esenler-Bağcılar
    NUMBER OF STATIONS 15

STATIONS: Mecidiyekoy, Caglayan, Kagithane, Nurtepe, Alibeykoy, Yesilpinar, Veysel Karani,
Akşemsettin, Kazım Karabekir, Yenimahalle, Karadeniz Neighborhood, Giyimkent-Tekstilkent, Century
District, Göztepe and Mahmutbey.
In tunnels excavations, the arrival tunnels are simultaneously excavated with 3 TBM (mole).
At the same time, the excavations at 5 metro station continue at a great pace. 19 works on the construction site as of today

  1. ETAP
    MECİDİYEKÖY-BEŞİKTAŞ-KABATAŞ METRO LINE
    LENGTH 7 KM
    STATION 3
    STATIONS: Kabataş, Beşiktaş, Mint,
    TENDER: TO BE MADE IN MARCH

3.ETAP
MAHMUTBEY-BAHCESEHIR METRO LINE

In the continuation of Mahmutbey Halkalı The metro, which will pass through the Mass Housing area, will reach Bahçeşehir.
It will reach. Bahçeşehir-Mecidiyeköy-Mahmutbey-Beşiktaş-Kabataş will be connected by metro line.

TRANSPORTATION TIMES WITH METRO

Mahmutbey-Mecidiyeköy 26 minutes
Kağıthane-Mecidiyeköy 4,5 minutes
Alibeyköy-Taksim 12 minutes
Kagithane-Uskudar 26 minutes
Tekstilkent-Mecidiyeköy 20,5 minutes
Caglayan-Yenikapı 14,5 minutes
Alibeyköy-Bostancı 47 minutes
CaglayanX Üsküdar 23,5 Minutes
UmraniyeX Kagithane 39,5 Minutes
Eyüp (Alibeyköy) - Kadıköy 36,5 Minute
Beşiktaş-Mecidiyeköy 5,5 minutes
Beşiktaş-Kağıthane 10 minutes
Besiktas-Mahmutbey 31,5 minutes
Besiktas-Alibeyköy 12,5 minutes
Besiktas-Etiler 13 minute
Besiktas-Sariyer Hacıosman 25,5 minutes
Bahçeşehir-Mahmutbey 21 minutes
Bahçeşehir-Mecidiyeköy 47 minutes
Bahçeşehir-Beşiktaş 52,5 minutes
Halkalı Mass Housing-Beşiktaş 38,5 minutes

When the line is commissioned, the existing rail systems with the 4 transfer station will be connected;

• Kabataş-Taksim Funicular line and Eminönü-Kabataş by tram Kabataş'T,
• In Mecidiyeköy with Yenikapı-Hacıosman Metro line,
• Topkapı-Sultançiftliği line in the Black Sea (Metris region)
• It will be connected to Mahmutbey via the bus station-Bağcılar-Başakşehir-Olympic line.

Be the first to comment

Leave a response

Your email address will not be published.


*