35 Izmir

Cumaovası-Torbalı-Tepeköy Electricity supply to İZBAN line

Cumaovası-Torbalı-Tepeköy Electricity supply to İZBAN line: İzmir Governor's Office, Cumaovası-Torbalı-Tepeköy line section Electrification Facilities Project has been completed. The governor's office explained in his statement: ında By law, whether or not there is energy, to navigate the railway lines, to touch the lines under the electricity, to touch the devices, wire or similar objects. [more…]

06 Ankara

Yenimahalleye Second Ropeway Line Coming

Yenimahalleye Second Cable Car Line is Coming: Under the construction work of the cable car line between Yenimahalle-Şentepe, which was built by the Metropolitan Municipality, the guide ropes were taken with the help of helicopters. EGO General Manager Necmettin Tahiroğlu, public transport for the first time in Turkey [more…]

34 Istanbul

High-speed train tickets

High-speed train tickets: High Speed ​​Train timetable after the change of the same ticket sold to more than one person caused the crisis. TCDD officials pay a part of the passengers while some of the passengers are on the ground and [more…]

06 Ankara

Ankara - Istanbul Pendik

Ankara-Istanbul The last stop in the high-speed train line Pendik: High-speed train goes to Istanbul… Very nice a But the last stop is why Pendik son Why isn't it more? TCDD General Manager Süleyman Karaman's response: This is our business aman At the end of 2015 [more…]

GENERAL

Old train lines modernize

The old train lines are modernizing: the high-speed train journey between Konya and Ankara dates back to Istanbul and the old train lines are not forgotten. Electrification and signaling works planned to be done on conventional lines are planned to be completed by 2018. This work [more…]

RAILWAYS

Trains and Overpasses

Trams and Overpasses of Kocaeli: As of 1985, we live within the boundaries of Kocaeli Province, in a period of time that can be considered politics (although we can not manage) and Journalism together and constantly moving [more…]

06 Ankara

Yenimahalleye Second Ropeway Line Coming

Yenimahalleye Second Cable Car Line is Coming: Under the construction work of the cable car line between Yenimahalle-Şentepe, which was built by the Metropolitan Municipality, the guide ropes were taken with the help of helicopters. EGO General Manager Necmettin Tahiroğlu, public transport for the first time in Turkey [more…]

RAILWAYS

Tramway from Tutus

Tram Stop from Tutus: Muharrem Tutus, AKP Izmit District Manager, added a new one to his promises. Tutus who attracted attention with his different approaches while he was the head of the youth branch became a member of the county board of directors. [more…]

06 Ankara

Bomb panic in the Ankara subway

The bomb panic in the Ankara subway: The suspicious bag left behind by the waiting seats in Ankara Kızılay Metro caused panic. The detonator was detonated with children's supplies. Upon understanding of the situation, the metro services returned to normal. Waiting tables in Ankara Kızılay Metro [more…]