Yenikapı Transfer Station 9 to be opened on November Sunday

Yenikapı Transfer Station will open on Sunday, November 9: The last part of Yenikapı, which has become an important point in the integration of Istanbul's rail system network, is put into service.

Yenikapı Transfer Station where Marmaray, Istanbul Metro and Aksaray-Airport metros meet is now complete. 9 The length of the Aksaray-Yenikapı line will be opened with the participation of Prime Minister Ahmet Davutoglu on November November 700 meter. When the line is put into service, Atatürk Airport-Kartal will be landing in 81 minutes. Thus, from Basaksehir to Kartal, there will be continuous access to the rail system from Olimpiyatköy to Hacıosman. Marmaray, which met in Yenikapı, Istanbul Metro and Aksaray-Airport subway will be measured in minutes. The construction of Aksaray-Yenikapı, which started in 2012, was planned to be opened in the summer months; however, signaling studies of the line were completed in October. Connection tunnel between Aksaray and Yenikapı 1 can be passed in minutes. There will be uninterrupted access to Yenikapı by metro from Başakşehir or Olimpiyatköy. Transfer can be made with Marmaray or Istanbul subway in Yenikapı. On the other hand, from Yenikapı to Otogar in 19 minutes, to the airport in 32 minutes, to the Olympic Stadium in 42 minutes. Between Başakşehir and Üsküdar, the 1 will take hours.

Be the first to comment

Leave a response

Your email address will not be published.


*