Ratio of locality in rail vehicles

Location of rail vehicles: Minister of Science, Industry and Technology Fikri Işık said that the national train will be on the rails in November. Science, Industry and Technology Minister Fikri Işık said that a 1-megawatt electric locomotive was developed and a prototype was produced to meet TCDD's maneuvering and short-distance load-carrying needs. Stating that the draw frame system, which gives the ability to move to high-speed trains and high-speed trains, is complemented by domestic facilities, Işık said, 'We define this as a locomotive, but at the moment we have made the traction system of the high-speed train. All of them were imported until now. Test drives are in the final stage, things are going well, we went to the next stage, "he said.

Toggling

Minister Işık pointed out that work is also being carried out for the traction system of high speed trains, and we will switch from the '1 megawatt traction system to the 5 megawatt traction system. The project is a very important step towards reducing the current account deficit and increasing exports. Turkey will be one of the world some time after the rail authority 'he said.

18 Scientist is Working

TUBITAK, which is supported by work of 18 scientists and about 10 million pounds budget of the project, Turkey Locomotive and Engine Industry Inc. (TULOMSAS) and is carried along and supplier describing the provision of necessary materials from industrial firms Light, gave the following information:
DE11000 locomotives, which are in TCDD inventory and have problems in obtaining spare parts from abroad, have been requested to be modernized since the mid 90s. In the business development studies carried out by TÜLOMSAŞ with TÜBİTAK MAM in 2008, it was brought to the agenda by modernizing DE11000 locomotives by converting them into electricity in line with TCDD needs. A project proposal has been prepared for the development of these technologies, which are needed by the rail vehicle industry of our country, and that have a high added value, and a 1 megawatt 'E1000 Type Locomotive Development' project has been presented to TÜBİTAK KAMAG within the framework of TARAL 1007 program.
The project, which was launched in 2011, is scheduled to be completed in November.
The most critical component of the project due to rail transport and traction and train control systems on which we depend entirely designed and abroad for the first time in Turkey, making integration via locomotive will be delivered to TCDD. We produced the electric locomotive, the test drives were completed. We took an important step towards the original national train, and there is an electric car. '

Ratio of locality in rail vehicles

Işık stated that they plan to put 2023 maneuver locomotives and 70 high speed trains into service by 110. Explaining that TÜLOMSAŞ has connections with foreign markets, Işık stated that the organization exports to South East Asia, North Africa and Middle East countries where the rail transportation sector started to develop. According to the 2023 targets of the Ministry of Transport, Maritime Affairs and Communications, we know that the planned investment in the rail transportation sector is 45 billion dollars. With the knowledge and experience to be obtained as a result of this project, it is also aimed to increase the localization rate of rail vehicles.

Be the first to comment

Leave a response

Your email address will not be published.


*