Sabiha Gökçen Airport Rail System Connection Project Tender Canceled

AYGM Sabiha Gökçen Airport Rail System Connection Project Construction, installation and commissioning of electromechanical systems is expected to be postponed to 15 October 2014



New developments related to the “Sabiha Gökçen Airport Rail System Connection Construction and Electromechanical Systems Procurement, Installation and Commissioning Works“ tender to be realized by the General Directorate of Infrastructure Investments.
According to the information received by the Investments Magazine; The bidding deadline, which is announced as 25 September 2014, is expected to be postponed to 15 October 2014.
Small probability that the tender can be canceled due to changes in the excel table in the specification, officials, the issue will gain clarity these days, according to the case may be published in the addendum. As it is known, the full list of 04 2014 September XNUMX suppliers has been determined as follows:
1. Construction
2. Adfa Contracting
3. Alsim Alarko
4. Asian Rail Rail
5. Cengiz Construction
6. Steels Inc.
7. Dido-Ray Construction
8. Doğuş Construction
9. ETM Electric
10. Galkon Aviation
11. Gülermak Construction
12. IC İçtaş
13. Kalyon Construction
14. Kolin Construction
15. Limak Construction
16. Makyol Construction
17. Mapa Construction
18. Nurol Construction
19. Özgün Construction
20. Özaltın Construction
21. Ray Engineering
22. Sed-Yol Construction
23. Seza Construction
24. Tekfen Construction
25. Türkerler Construction
26. Ultra Technology
27. Building Center
Within the scope of the tender, the construction, installation and commissioning of the electromechanical systems with the construction of 7,4 km-rail public transportation system will be carried out.
Ref .: Investments Magazine 1197 / 08 September 2014 (APE)

Source : I www.yatirimlar.co


sohbet

Be the first to comment

Comments

Related Articles and Advertisements