Tram coming to the coast of the Golden Horn

A tram comes to the shore of the Golden Horn: Istanbul Metropolitan Municipality Mayor Kadir Topbaş, one of the projects promised in the squares before the local elections, “Bayramıçaka-Eyüp-Eminönü Rail System Project basıl button was pressed.

The feasibility project for the Bayrampaşa-Eminönü-Eyüp tram line, which is planned to be 12 kilometer length by İBB Transportation Department Directorate of Transportation Planning, is going to tender in 2 September. Operation scenarios will be determined and the zoning plan modifications of the selected route will be prepared. Financial and Economic Feasibility After the completion of the studies, the timetable for the construction tender will be determined. The total time of work according to the specification is 240 days. The project will be built with Build-Operate-Transfer model. The project will be prepared to be tendered internationally and on credit.

The current situation and development plans will be taken into consideration by analyzing the area in terms of land use characteristics. Municipality, according to the results of studies, individuals, foundations, Treasury and municipality parcels of the region will be expropriated over the fair values.
The current situation and development plans will be taken into consideration by analyzing the region in terms of land characteristics. Municipality, according to the studies of the individual, Foundation, Treasury and Municipality of the parcels of the region will be expropriated over the fair values.

3 ALTERNATIVE ROUTE FOR TRAMVAY

In the region, the study will be carried out according to forecasts of passenger and travel demand. 3 different alternatives will be produced for the tram route. After the studies and evaluations, tram routes and station locations will be determined.

Be the first to comment

Leave a response

Your email address will not be published.


*