The button was pressed for the Sultanbeyli Ropeway Project

Press button for Sultanbeyli Cable Car Project: Istanbul Metropolitan Municipality pressed the button for Sultanbeyli Cable Car Project. With the project to be put out to tender on September 16, the 3-kilometer cable car line will be completed in 240 days. When the project is completed, it will make a great contribution to tourism besides easing transportation.

Istanbul Metropolitan Municipality provides statue for Sultanbeyli Cable Car Project. Istanbul Metropolitan Municipality, which is currently at project level and has opened a procurement tender for financial and economic feasibility studies such as route planning and ground survey, determined the tender date as 16 September. The works to follow the tender will be completed in 240 days. Once completed, information on the passenger capacity of the line planned to find the 3 mileage will be explained by the completion of the project.

DOPING TO ANATOLIAN SIDE

Aydos Castle, which is one of the important historical areas remaining from the period of the Eastern Roman Empire, but could not get enough share from tourism due to publicity and transportation difficulties, and the Sultanbeyli pond, one of the important recreation areas of the Anatolian Side, will be connected by the cable car line. Aydos Hill, which is a 11th century work and built to prevent Turkish raids in Istanbul, will be the new Çamlıca with the completion of the cable car line and will be added to tourism. The cable car line, which will have a station in the center of Sultanbeyli district, will also ease the transportation of the district.

Be the first to comment

Leave a response

Your email address will not be published.


*