Railway Connection Project to Sabiha Gökçen Airport

AYGM Railway Connection Project to Sabiha Gökçen Airport Expected to receive tender announcement



General Directorate of Infrastructure Investments,Kadıköy - Preparation works for the Railway Connection Infrastructure and Superstructure Construction Tender of Kaynarca Metro Line to Sabiha Gökçen Airport have been completed.
According to the information received by the Investments Magazine; The awaited Authority approval was obtained in order to make the announcement about the tender. Announcement is expected for the tender in the coming days.
The authorities stated that the railway connection between Sabiha Gökçen Airport and 9 kilometers was determined.
As it is known, Yüksel Domaniç - Atac won the tender for Railway Connection Survey Project and Engineering Services for Sabiha Gökçen and Atatürk Airports, whose proposals were collected on 25 May 2009, and a contract was signed with the joint venture group on 27 July 2009 over 1.752.825 TL. The total cost of the approximately 16 km long railway line project was determined as 193 million liras.
Ref .: Investments Magazine 1186 / 16 June 2014 (APE)

Source : I www.yatirimlar.co


sohbet

Be the first to comment

Comments

Related Articles and Advertisements