Hospice metrobus shutting down 45 log

Darülaceze metrobus station will be closed for 45 days: Within the scope of efforts to make Metrobus stations more comfortable in terms of pedestrian and disabled use and access, Darülaceze (PER-PA) Station will not be used for 45 days.

In a statement made by the IMM, it was said:

* Talatpaşa Bridge feet, D-100 narrowing the road due to the collapse of the road, in the context of rebuilding works, Darülaceze (PER-PA) Metrobus Station, the citizens of the temporary pedestrian overpass is removed to prevent victims. After this stage;

* Renovated Talatpaşa Bridge Metrobus Station to access the pedestrian and pedestrian 6 meter-wide, 8 meter-long Platform to be added.

* Tourniquets will be moved to the platform.

* Pedestrian ramp to access the station.

* Within the scope of these studies, Metrobüs Station will be renewed.

* With this work to be done, our disabled citizens will also have access to Darülaceze (PER-PA) Metrobüs Station in a comfortable manner.

* 17 June 2014 will start on Tuesday at 00.00 (Tuesday night connecting to Tuesday) and HU (PER-PA) Metrobus Station will not be available for 45 days, due to the work that will take 45 days.

Be the first to comment

Leave a response

Your email address will not be published.


*