Opened Izmir tramway line

Izmir tramway opened in front of the Metropolitan Municipality Konak and Karşıyaka The JCC rejected the objection made by Spain-Poland joint consortium to the tender for trams. The Metropolitan will make a contract invitation to the winning company.

The tramway projects prepared by Izmir Metropolitan Municipality were opened in order to breathe in the urban traffic. Mansion and Karşıyaka objection to the tender for the construction of tramways was rejected by the Public Procurement Authority. Upon the decision, the Izmir Metropolitan Municipality acted immediately. Gülermak Ağır San. Const. And Taah. A.Ş will be invited to the contract.

Mansion- Karşıyaka trams

Izmir Metropolitan Municipality, with the 12.6 kilometer-long 19-stop Konak Tram which will be implemented as a complement to the subway system in February, and 9.7-kilometer-long 15-stop Karşıyaka With the construction of the tram line, a total of 38 vehicles and spare parts to work on these two lines were tendered, but after the decision of the commission for the tram construction tender was notified to the companies, Comsa Sau & Pojazdy Sznynowe Pesa Bydgoszcz Spolka Akcyjna consortium made the last day's objection to the KİK. had moved.

Mulberry trees protected

Fahrettin Altay Square, which will start from the side of the market tram line, peak times of the 3'er minutes, the other time period is planned to work in the 4-5 minute intervals.

Şehit Binbaşı Ali, where the Tax Office is located, will go to the shore following Tufan Street.

In Konak, the tram line that runs from the side of the road leading to the Gazi Boulevard under the pedestrian bridge in front of the Izmir Metropolitan Municipality and Konak Pier will enter Şehit Fethi Bey Street and from there on, it will use the route with the highway traffic. Following the Republic Square, the line will go to Şehit Nevres Boulevard and from there to Şair Eşref Boulevard. The tram line is going to be divided into two. The line which will continue in this way until Vahap Özaltay Square will be reunited near Alsancak Station. Following the Gar, the tram line that goes to Şehitler Street will end at the Halkapınar Warehouse Area of ​​İzmir Metro.

Izmir Metropolitan Municipality, Poet Esref Bulvari has changed the project in order to protect the mulberry trees in the middle center.

Karşıyaka tramway

Alaybey-Karşıyaka- 9.7 kilometer route between Mavişehir and 15 stop and 17 tram line with two vehicles will work as a round-trip. Karşıyaka tram, starting from Alaybey by the coast Bostanlı Pier, and then Ismail Sivri Street, Martyr Cengiz Topel Street, Selcuk Yasar Street and Cahar Dudayev Boulevard followed by Izban Cigli Warehouse facilities next to Mavisehir Suburban Station. In project scope Karşıyaka an overpass or underpass is planned to connect the pier with the bazaar. The tram line will provide transfer to İZBAN, ferries and buses.

Be the first to comment

Leave a response

Your email address will not be published.


*