Tender Announcement: Installation and dismantling of foil advertisement on wagon exterior surfaces (YHT, EMU, conventional wagon with DMU sets)

General Directorate of TCDD
Installation and disassembly of foil advertising clothings on wagon outer surfaces
SUBJECT OF THE TENDER AND SUBSEQUENT ISSUES
Article 1 - Information on the business owner
1.1. The owner of the business administration;
a) Name: General Directorate of TCDD
b) Address: Talatpaşa Boulevard 06330 Gar / Altındağ / ANKARA
c) Phone number: 0312 309 05 15 / 4319-4573
d) Fax number: 0312 311 13 06
e) e-mail address: alimkemer@tcdd.gov.tr
f) Name / Surname / Title of the Personnel concerned: Alim KEMER Branch Manager
1.2. Tenderers may obtain information about the tender by contacting the personnel from the above addresses and numbers.
Article 2- Information on the subject of the tender
Goods subject to the tender;
a) Name: Installation and disassembly of 2014 m2.500 foil advertising clothings on conventional wagon outer surfaces with YHT, EMU, DMU sets in 2
b) JCC registration number: 2014 / 30234
c) Quantity and type: YHT, EMU, DMU sets with total 2.500 m2 foil advertising clothings for conventional wagon outer surfaces assembly and disassembly
d) Place of delivery: specified in technical specifications.
e) Other information:
Article 3-Tender Information
Information on the tender;
a) Tender procedure: Open Tender Procedure
b Address of the tender: TCDD General Directorate
Talatpaşa Boulevard 06330 Gar / Altındağ / ANKARA
c) Tender date: 26.03.2014
d) Tender time: 14.00
e) Tender commission meeting place: General Directorate of Turkish State Railways (TCDD) Directorate General of Passenger Office of Goods and Service Procurement Commission Passenger Department Meeting Hall (Room 4030)

ADMINISTRATIVE CONTRACT
ADMINISTRATIVE SPECIFICATION
TECHNICAL SPECIFICATIONS
Tender notices published on our website are for information only and do not replace the original document. The original document is valid for the differences between published documents and original tender documents. Our sources are Official Gazette, Daily Newspapers, Public Institutions and Institutions web pages.

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.