Mecidiyeköy Mahmutbey Metro Line stops

Mecidiyeköy Mahmutbey Metro Line stops: The foundation of Mecidiyeköy-Mahmutbey Metro Line will be laid at a ceremony held at Alibeyköy Square on Sunday, 09 February 2014 at 13:30.
The Metro Line main line tunnels and viaducts are composed of total 18 station stations in drilling, opening and closing and viaduct types with a total length of 15 km.
Mecidiyeköy-Mahmutbey (Şişli-Kağıthane-Eyüp-Gaziosmanpaşa-Esenler-Bağcılar Districts) The Metro Line will be capable of carrying 70.000 people in one direction per hour.
Mecidiyeköy Mahmutbey subway line auction!
850 million TL will be paid by the Gülermak-Kolin-Kalyon partnership. The total length of the metro line, which will take 26 minutes in total, is planned to be completed in 26 minutes. .
The contract for the line was signed and the works were started on 02.01.2014 and the works were started.
Metro from Mahmutbey KabataşIt was designed up to. The first stage is from Mecidiyeköy and the second stage is Kabataşis planned to pass.
Information from the tender bulletin of the Mecidiyeköy Mahmutbey metro line!
Statements in the Public Procurement Authority and the tender bulletin published in the European Union bulletin are as follows;
“The metro, which will be the solution to the traffic problem of Şişli, Kağıthane, Eyüp, Gaziosmanpaşa, Esenler and Bağcılar, will start integrated in Hacıosman-Yenikapı Metro in Mecidiyeköy.
The project, which will pass through Çağlayan, Kağıthane, Nurtepe Alibeyköy regions and will be integrated into the existing Edirnekapı-Sultançiftliği Line in Karadeniz District, will be integrated with Mahmutbey-Başakşehir Metro, built in Mahmutbey, passing through Tekstilkent and Yüzyıl District.
The line, which scanned dense areas in terms of business and settlement, later on from Mecidiyeköy KabataşIt is planned to be extended to. Mecidiyeköy-Mahmutbey Metro Line, which is approximately 17,5 km long, will carry 70 thousand people in one direction per hour. The project, which will include viaducts as well as tunnels, will consist of a total of 15 stations in the type of drilling, on-off and viaduct. When the metro line is completed, Mecidiyeköy will reach Mahmutbey in as little as 26 minutes. ”
Mecidiyeköy is the tag of Mahmutbey Metro!
Length: 18 Km
Station names: Mecidiyekoy, Caglayan, Kagithane, Nurtepe, Alibeykoy, Yesilpinar, Veysel Karani, Aksemsettin, Kazim Karabekir, Yenimahalle, Karadeniz Neighborhood, Tekstilkent, Century District, Goztepe and Mahmutbey Route: Sisli-Kagithane-Eyup-Gaziosmanpasa-Esenler-Bagcilar
Number of Stations: 15
Tender price: 850 million pounds
Tender date: 18 September 2013
Tender winners: Gülermak-Kolin-Kalyon partnership
Contract date: 02 January 2014
Date of laying ceremony: 09 February 2014
Completion date: 2017
Passenger capacity: 70.000 person / hour in one direction

Click on the map to see it larger

Be the first to comment

Leave a response

Your email address will not be published.


*