Gül and Erdoğan for the First Mount on the Bay Bridge

Gul and Erdogan also come for the first assembly on the Gulf Bridge: Izmit Gulf Bridge, one of the most important crossing points of the Gebze-Orhangazi-Izmir highway, which will reduce the distance between Istanbul and Izmir to approximately 3,5 hours with the ceremony that President Abdullah Gul and Prime Minister Recep Tayyip Erdogan will attend tomorrow. The first assembly of the shaft connection beams where the feet of will be seated will be performed.
The ceremony will be held at Dil Burnu, where the feet of the Gulf Bridge at the Kocaeli Dilovasi crossing will take place. President Abdullah Gül, Parliament Speaker Cemil Çiçek, Prime Minister Recep Tayyip Erdogan and some ministers will attend the ceremony, which will start tomorrow at 10.00:XNUMX.
The 2-682-meter-long Gulf Bridge, which was built between Dil Cape in Kocaeli Dilovasi of Izmit Bay and Cape of Yalova Hersek, will be sunk with a ceremony, which will be launched in December, with the height of a 4-storey apartment and the size of approximately 16 basketball courts. The construction of shaft connection beams will be started by mounting steel shafts on these caissons that will be the basis of the bridge legs.

Be the first to comment

Leave a response

Your email address will not be published.


*