BursaRay Kestel Line starts tomorrow

Followings
Followings

BursaRay Kestel Line starts tomorrow: Bursa Metropolitan Municipality with a reachable city target of the light rail system will extend Kestel'a BursaRay Kestel Line's first 4 station starts tomorrow tomorrow.

Bursa Metropolitan Municipality, with the aim of a reachable city of light rail system will extend Kestel'e BursaRay Kestel Line's first 4 station at the time of the 11.00 in the hours tomorrow with the participation of Deputy Prime Minister Bulent Arinc.

The start of the Kestel line will be particularly relieved by the traffic of Ankara Road. Kestel and Gursu citizens from Bursa to Bursa by means of this line will be connected to the bus lines, using the feed lines will come to BursaRay stations. Citizens living in the eastern regions of the city BursaRay'la uninterrupted access to the university and Mudanya road.

Metropolitan Mayor Recep Altepe, Bursa to solve the transportation problem with rail system investments in this period, although the program is not in the program started 7 Xanton X-TRX stop Bursaray Kestel Line's first 8 station will be put into service.

Mayor Altepe explained that the Metropolitan Municipality attaches great importance to comfortable transportation in Bursa and said, ulaş One of the most important projects of Bursa has come to an end in the Kestel stage of BursaRay line. The Metropolitan Municipality, which continues to invest in a city that is accessible and healthy, provides the most important and deep-rooted solution in transportation by means of uninterrupted transportation. Transportation from one side of the city to the other is becoming more practical with rail systems, Şehr he said.

President Altepe, reminding that the University and Labor lines were completed during this period, “We have come to the end of the BursaRay Kestel line we have designed in this period. We are launching the first 4 station of Bursaray Kestel Line. Thus, Kestel and Gürsu will be integrated with Bursa and the people of Bursa will take a breath. Böylece

Bursa Metro Timetables, Ticket Prices and Route Map; There are 7 stations in Bursaray, including 38 underground. The total length of the two-track route is 39km and is completely independent of the road system. The longest line of BursaRay: 2. This Metro line starts at (Kestel) Kestel stop and ends at (Nilüfer) University stop. 31 covers an area of ​​km and has an 31 stop.

Shortest line: 1. This Metro line starts at (Nilüfer) Emek stop and ends at (Yıldırım) Arabayatağı stop. 20 covers the area of ​​18 km with stop.

BursaRay route joins at Mudanya Road Labor Station and Kestel Station in the west starting from the University. Then, following the Ankara Road, it goes from Kent Square to Şehreküstü Square and follows Haşim İşcan Street and goes back to Ankara Road via viaduct and ends at Kestel Station. The system known as Bursa Metro is actually a light rail system and this light rail system works integrated with Bursa trams.

Bursaray Route Map and stations

BursaRay route joins at Mudanya Road Labor Station and Kestel Station in the west starting from the University. Then, following the Ankara Road, it goes from Kent Square to Şehreküstü Square and follows Haşim İşcan Street and goes back to Ankara Road via viaduct and ends at Arabayatağı Station.

Line Length (Double Line) 39 km
Warehouse Lines 9,9 km
Number of Stations 38 (7 Pieces Underground)
Energy Type 1500 V DC
Energy Feed Type Catanery
Maximum Speed 70 km / h
Rail Width 1435 mm
Minimum Horizontal Curve 110 m
Platform Height 120 m

Bursa Metro Hours

Bursa metro stations passengers begin to carry in certain hours. Bursaray started transportation in the early hours of the morning and continues to serve until late at night. Starting at 05.40 and continuing until 00.16 at night, Bursaray can provide services at different times on weekends. Bursa Subway Line times may vary during public holidays or holidays.

Bursa Metro Ticket Prices

in BursaRay

  • Full ticket 2,55 TL
  • Student 1,45 TL
  • Discounted tickets 2,10 TL

monthly of student subscription card fee 100 is TL.

Bursa Metro History

  • 31 January 1997 BursaRay contract was signed.
  • 14 October 1998 BursaRay construction works started.
  • 23 April 2002, BursaRay 1 covering Small Industry - Urban and Organized Industry - Acemler lines. Passenger train operation was started in Stage A Section. (17 Station)
  • 12 May 2008 commenced train operation in BursaRay 1.Step B Section covering Şehreküstü - Arabayatağı line. (6 Station)
  • 24 December 2010, BursaRay 2 covering Small Industry-University and Organized Industry-Labor lines. Passenger train operation started in the Stage Department. (8 Station)
  • 19 March 2014 commenced train operation in BursaRay 3.Step Section covering Arabayatağı-Kestel line. (7 Station)
  • 15 On January 2016, the Kestel Stage signaling system was commissioned and non-stop operation was started between the University and Kestel.

Bursa Railway System Map

Current Railway Tender Calendar

Salt 19
Tsar 20

Tender Notice: Irmak Zonguldak Line Open Channel and Belt Drainage

November 20 @ 10: 30 - 11:30
Organizer: TCDD
444 8 233
For 21

Tender Announcement: Car Rental Service

November 21 @ 14: 00 - 15:00
Organizer: TCDD
444 8 233

Railway Tender News Search

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments