We Said Everywhere Subway Everywhere, We Continue

Anatolian Side Metrobus Stops and Metrobus Map
Anatolian Side Metrobus Stops and Metrobus Map

We Said Everywhere Metro Everywhere Metro We Continue: Continuing its investments without slowing down, Istanbul Metropolitan Municipality adds a new one to its investments in the field of transportation. Speaking at the Mecidiyeköy-Mahmutbey Metro Contract Signing Ceremony, Mayor Topbaş said, "By 2019, we will have a rail system that can be used by 11 million people."

President Kadir Topbaş, who spoke at the signing ceremony of the Saraçhane Presidential Palace, expressed the happiness of adding a new one to the metro networks produced as a solution to the transportation problem of Istanbul, saying, ine We are now signing the signature of Mecidiyeköy-Mahmutbey metro line. The next month will be laid and 17.5 will be completed at 2017.

Emphasizing that Istanbul is working hard to make Istanbul a more livable and problem-free city in the future, Mayor Topbaş said: “Today, transportation and mobility are at the forefront in all cities of the world, especially in metropolitan cities. They are in search of a new subject. We are continuing our investments within the framework of the plan prepared by academics, experts and municipal members, by following the world closely and by showing sensitivity in transportation. ”

Stating that even Istanbul Employees of the Metropolitan Municipality could not pay their salaries in the past, Mayor Topbaş said that he has made huge investments with his own means and continued: “We invested around 10 billion in Istanbul in 60 years. We allocated 24.6 billion liras of this amount to transportation. A while ago, we shared with the public in Istanbul how and how subway networks will access Istanbul. We carried out the work on the date we said, keeping the promise we made to citizens. ”

- Istanbul is now

Indicating that Istanbul is being followed by envy and becoming a center of attraction, Mayor Topbas said that companies doing business in Istanbul could easily get jobs because of Istanbul reference anywhere in the world. Mayor Topbaş said: modern I would like to express here in particular that we are making the most modern metro as we have the latest subway construction in the world. When we reach the end of 2017 400 km or even reached a city will be over. Then, with 776 km, Istanbul will be the second city with the most rail system after New York. Da

Mayor Topbas said that wherever he lives in Istanbul, there will be no problems at every point of his stay, and that metro networks will connect every corner of Istanbul.

- The price of the 850 Million-

President Topbaş also gave the following information about the new subway line to be signed: “Our 17.5 km and 15 station subway line, which we have received at the signing ceremony, passes through 6 districts and passes through the busiest regions of these districts. We are actually from Mahmutbey KabataşHere, I would like to express that we have designed Mecidiyeköy as a transportation line until the first stage. As the second stage, Mecidiyeköy-KabataşThis is basically a line to come to. In other words, Esenler, Gaziosmanpaşa, Esenler, Kağıthane and Şişli will be reached from Mahmutbey. This route can be easily used to reach the beach. I congratulate the winning consortium for a tender price of 850 million TL. It will be completed in 2017 as time. This is not a year-long subway construction. With our own resources, we will solve the problem of transportation of a very important axis. We will perform the groundbreaking ceremony with live connections to each of the stations in 6 districts. When we reach 2016, we will have a rail system network that 7 million Istanbul users will use and a metro network that will be used by 2019 million people in 11. ”
İBB President Kadir Topbaş, Esenler Mayor Tevfik Göksu, Bağcılar Mayor Lokman Çağrıcı, Kâğıthane Municipality Fazlı Kılıç, as well as members of Kalyon, Gülermak and Kolin consortium who took the tender for the construction of the line participated in the ceremony at the İTÜ Headquarters building in Saraçhane.

MECİDİYEKÖY MAHMUTBEY METRO

Mecidiyeköy-Mahmutbey Metro will pass through Şişli-Kağıthane-Eyüp-Gaziosmanpaşa-Esenler-Bağcılar districts.
Mecidiyeköy-Mahmutbey Metro Line Starting as integrated with the existing metro station in Mecidiyeköy, it will be integrated into the Edirnekapı Sultançiftliği line, from there, through the Mahmutbey-Başakşehir line, which was opened to the new service through Tekstilkent, Yüzyıl Mahallesi. The line, which scanned dense areas in terms of business and settlement, later came from Mecidiyeköy. KabataşIt is planned to be extended to.

Mecidiyeköy-Mahmutbey (Şişli-Kağıthane-Eyüp-Gaziosmanpaşa-Esenler-Bağcılar Districts) The Metro Line will be capable of carrying 70.000 people in one direction per hour.

The Metro Line main line tunnels and viaducts, which are approximately 17,5 km-long Mecidiyeköy-Mahmutbey (Şişli-Kağıthane-Eyüp-Gaziosmanpaşa-Esenler-Bağcılar Districts), consist of total 15 station with drilling, opening and closing and viaduct type.

When the metro line is completed; The travel time from Mecidiyeköy to Mahmutbey will go down to 26 minutes.

STATIONS

Mecidiyekoy, Caglayan, Kagithane, Nurtepe, Alibeykoy, Yesilpinar, Veysel Karani, Aksemsettin, Kazim Karabekir,

Yenimahalle, Karadeniz Mahallesi, Tekstilkent, Yüzyıl Mahallesi, Göztepe and Mahmutbey.
Mecidiyeköy - Mahmutbey Metro Line, Warehouse - Maintenance Area and Warehouse Connection Lines Construction Works will be done by the Gülermak-Kolin-Kalyon Partnership for 850 million TL.

JOURNEY TIMES FROM MAHMUTBEY

Mahmutbey - Mecidiyeköy metro with 26 minutes
Mahmutbey - Sariyer Hacıosman Metro + Metro with 45 minutes
Mahmutbey - Yenikapı Metro + Metro with 39,5 minutes
Mahmutbey - Üsküdar Metro + Metro + Marmaray with 48,5 minutes
Mahmutbey - Kadıköy 52 minutes by Metro + Metro + Marmaray
Mahmutbey - Sabiha Gokcen Airport Metro + Metro +
Marmaray + Metro with 95,5 minutes
Caglayan - Gaziosmanpasa Metro with 13 minutes
Mecidiyeköy - Alibeyköy Metro with 7,5 minutes

Be the first to comment

Leave a response

Your email address will not be published.


*