Mahmutbey metro will transport 70 thousand people per hour

Mahmutbey metro will carry 70 thousand people per hour: In the tender of the metro project, which will reduce the distance between Mecidiyeköy and Mahmutbey to 26 minutes, the consortium formed by Gülermak Ağır Sanayi İnşaat, Kolin İnşaat and Kalyon İnşaat gave the lowest bid of 849 million 440 thousand TL.
In the tender for Mecidiyeköy - Mahmutbey (Şişli-Kağıthane-Eyüp-Gaziosmanpaşa-Esenler-Bağcılar) metro line, the consortium formed by Gülermak Ağır Sanayi İnşaat, Kolin İnşaat and Kalyon İnşaat gave the lowest bid of 849 million 440 thousand TL. A total of 14 companies and groups participated in the tender, which was held in a closed envelope manner at the Istanbul Metropolitan Municipality.
NEAR THE LARGE LEMAK
In the tender headed by Istanbul Metropolitan Municipality Rail System Tender Commission President Dursun Balcıoğlu, the second lowest bid after the consortium formed by Gülermak Ağır Sanayi İnşaat, Kolin İnşaat and Kalyon İnşaat, Limak İnşaat and Moskovskiy Metrostory Open AS Center Russia with 859 million 821 thousand 395 lira 12 kurus Turkey's Istanbul branch of its business partnerships gave. The third lowest price in the tender was 879 million 314 thousand 218 Turkish lira, given by the consortium of Kyvmetrobud Pjsc, Yda İnşaat Sanayi Ticaret AŞ and Nas İnşaat Sanayi Ticaret AŞ.
WILL EXTEND UNTIL KABATAŞ
The metro project that will reduce the distance between Mecidiyeköy and Mahmutbey to 26 minutes will be a solution to the traffic problem of Şişli, Kağıthane, Eyüp, Gaziosmanpaşa, Esenler and Bağcılar. After the line, which is about 17,5 kilometers long, KabataşIt is planned to be extended until. In the Mecidiyeköy-Mahmutbey Metro Line project, one of the most important investments of the European side, there will be different types of stops such as drilling, cut-and-cover and viaducts.
70 thousand people per hour will carry
Mecidiyeköy-Mahmutbey Metro Line, which is 17,5 km long, will carry 70 thousand people in one direction per hour. The project, which will include viaducts as well as tunnels, will consist of 15 stops in total. The metro will start in Mecidiyeköy as integrated into Hacıosman-Yenikapı Metro. The project, which will be integrated into the Edirnekapı-Sultançiftliği Line in the Karadeniz Neighborhood by passing through Çağlayan, Kağıthane, Nurtepe Alibeyköy regions, will be integrated with Mahmutbey-Başakşehir Metro, passing through Tekstilkent and Yüzyıl Neighborhood.

Be the first to comment

Leave a response

Your email address will not be published.


*