High Speed ​​Train Infrastructure Construction Project Seminar Was Held

High Speed ​​Train Infrastructure Construction Project Seminar was organized in Akçansa, Afyon Kocatepe University (AKÜ) Engineering Faculty, İmalat Ankara-İzmir High Speed ​​Train Project, Polatlı-Afyonkarahisar Section Infrastructure Manufacturing Project İmalat introductory seminar was held.
Seminar at AKÜ Ahmet Necdet Sezer Campus Faculty of Engineering Conference Hall was given by Sigma-YDA-Makimsan-Burkay Partnership Project Engineer Taylan Demir, the contractor.
Geological Engineer Taylan Demir, hend Polatlı-Afyonkarahisar High Speed ​​Train Project Afyon project was completed, the people of Afyonkarahisar Ankara to reach 1,5 within hours.
Demir also gave information about some of the production items of the project and stated that the ğ New Austrian Tunnel Drilling Afyon method was used in the tunnels.
Conference, Vice Dean of AKÜ Faculty of Engineering Assist. Assoc. Dr. Tülay Altay, Project Engineer Demir'a to commemorate the day ended with a plaque.
AKU Faculty of Engineering Vice Dean Assist. Assoc. Dr. Together with Tülay Altay, a large number of students and faculty members of Mining Engineering, Geological Engineering, Civil Engineering and Surveying Engineering participated.


Source : I www.haberler.co



conversation

Be the first to comment

Comments