Istanbul's traffic will breathe through new rail system projects

Istanbul's traffic will breathe through new rail system projects: In the future plans of Istanbul, infrastructure and transportation activities will play an important role as well as giant construction. Istanbul Metropolitan Municipality (IMM), which is planning to implement new projects in the coming period, is preparing to attack especially in the area of ​​transportation.
Within the scope of this project, a new ropeway line was revealed while the discussions about the ropeway project between Zincirlikuyu and Çamlıca, announced by Kadir Topbaş, the Mayor of the Metropolitan Municipality. According to the plans of the IMM, a new ropeway will be built between the Rumelihisari and Otağtepe in the Bosphorus. 2 2023 XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX

The first one will catch up with 2015
It was decided that the first ropeway which was planned to be finished in Etiler and was planned to be finished in Çamlıca was to start from Zincirlikuyu. The 8 km project, which will be between Zincirlikuyu, Altunizade and Çamlıca, will be opened in 2015.
The municipality also plans to build a ropeway to the Golden Horn, between Eyup-Sutluce and the 3 kilometer. When these lines are completed, new ones will be added to ropeways in Maçka and Eyüp in Istanbul.

'Pendik Line' is coming in 2017
Marmaray projects also accelerated the municipality, the 9 km Sabiha Gokcen Airport-Pendik Marmaray connection will be put into service at 2017. 3.5 at Ataköy Marmaray-Ataturk Airport will open the Marmaray connection at 2017. The tramway projects of the municipality include the Edirnekapı-Vezneciler Tram line with an 3.5 km. The completion date of the line is specified as 2018.

Beyoğlu and Şişli will unite from the air

One of the other important projects of the Metropolitan Municipality is the Havaray lines. According to the investment plan announced by the IMM, alternative means of transportation will be activated with the projects of Havaray to be realized in many points of the city. Projects include 5.8 km Beyoğlu-Şişli Havaray Line, 7.2 km Sefaköy-Kuyumcukent-Airport Havaray Line and 5.5 km 4. Levent-Gültepe-Çeliktepe-Levent Havaray Line.
Apart from the European side, Havaray projects are also on the Anatolian side. According to this, the 100 km Havaray Line will be built on Kartal-D / 3.
In addition, the 7.7 km Sabiha Gökçen Airport-Formula Havaray Line and the 3.6 km Maltepe-Başıbüyük Havaray Line. 11.1 km Ataşehir-Ümraniye Havaray Line is also among the projects. This line is scheduled to be completed at 2023.

New 'metro' lines on the road

IMM also continues to develop new metro projects. In this context, the first subway of the Anatolian side of Kadikoy-Kartal line opened the service of the municipality, the second metro, the Xnumx km Üsküdar-Sancaktepe metro will be put into service at 20. In addition, the 2015 km Kartal-Kaynarca metro, which aims to extend the metro line, will also be completed at 4.5.
3.55-km Şişhane-Haliç Metro Bridge-Yenikapı Line will be opened at the end of 2013. 0.7 km Yenikapı-Aksaray Rail System Line will be put into service at 2014. In addition, the municipality, which started the construction of the 3.3 km Levent-Rumeli Hisarüstü Mini Metro, will complete this metro at 2015. The 3-Kayabaşı metro line of 4 will be launched in 2018.
33 km Halkalı-Olimpiyat-3. The airport metro will be at 2018. Bağcılar-Halkalı The 9.4 km Light Metro will be completed in 2020. The 15 rail line will be constructed between 2018 and Başakşehir-Kayabaşı-Olympic Village in 12.5 and the 2022 km Bağcılar-Esenyurt Rail Line will be commissioned in XNUMX.

Bakirkoy
Among the new projects of the municipality, especially the developments in Bakırköy are noteworthy. Accordingly, plans include the 25 km Bakırköy-Esenyurt Metro Line. The route's route includes Bahçelievler, Küçükçekmece, Avcılar and Beylikdüzü. The construction of the line will start at 2013 and is scheduled for completion in 2017.
9 km Bakirkoy (IDO) -Bahcelievler-Bagcilar Line will be opened in 2017. The 7-Yenikapı-Bakırköy Metro Line will be completed at 2018.
The municipality accelerated the metro works in different districts. Accordingly, the 8 will be completed in October on the 18, the XMUMX km Mecidiyeköy-Mahmutbey Line. In addition, the 2017 km Kabataş-Mecidiyeköy Metro will be opened at 6.5.
13 km Ataköy-Ikitelli Light Metro will be opened at 2020.

Source : ekonomi.milliyet.com.t is

Railway News Search

Be the first to comment

Comments