34 Istanbul

Istanbul Bosphorus cable car project belongs to the elementary school student

The cable car project to the Bosphorus in Istanbul belonged to the primary school student: When the high school student living in Bursa learned that the construction of the "project of crossing the Bosphorus by cable car", which he dreamed and made a model 6 years ago when he was in primary school and sent to Istanbul Metropolitan Municipality Mayor Kadir Topbaş, will start the construction. [more…]

34 Istanbul

The cable car project belongs to the elementary school student

The cable car project to the Bosphorus belonged to the primary school student: When the high school student living in Bursa learned that the construction of the "project of crossing the Bosphorus by cable car", which he dreamed and made a model 6 years ago in primary school and sent to Istanbul Metropolitan Municipality Mayor Kadir Topbaş, [more…]

GENERAL

Maşukiye stone quarry is planned for YHT

Maşukiye quarry planned to be built for the YHT line is against the law: Reminding that they filed a lawsuit for the cancellation of the EIA positive report on the Maşukiye quarry planned to be built for the high speed train line, Bar Association President Tamer Solakoğlu said, [more…]

RAILWAYS

High speed train coming to Kütahyaya

Kutahya comes from high-speed trains: the Republic of Turkey State Railways (TCDD), the Kutahya high-speed train (YHT) line began to work for the establishment. TCDD has been announced for the application project tender for the YHT line to be established between Eskişehir and Kütahya. [more…]

TENDER RESULTS

TCDD rail procurement tender concluded

TCDD rail procurement tender has been concluded: The tender for the purchase of 30 tons of 2013 E13.000 and 60 tons of 1 E1.000 49 rails, whose bids were collected on April 1, 900 by the General Directorate of Turkish State Railways (TCDD), was concluded. Investments Magazine received [more…]

TENDER BULLETIN

RayHaber 16.08.2013 Tender Bulletin

Concrete Cable Channel and Cover will be taken for the supply of scissors (For the Installation of Underground Cables in the Installation of the Local Signal System to be made at İncirliova, Umurlu, Köşk, Sultanhisar, Atça, Kuyucak and Sarayköy Stations) Similar News:RayHaber 02.01.2013 Bidding BulletinRayHaber 03.01.2013 [more…]

TENDER RESULTS

Izmir BBBanliyö System Development Project Torbalı Kuşçuburnu Station construction tender proposals were collected

The bids of the tender for the construction of the Izmir BBB Suburban System Development Project Torbalı Kuşçuburnu Station have been collected. The bids of the tender for the “Construction of Kuşçuburun Station within the Scope of the İzmir Suburban System Development Project”, which will be realized by the İzmir Metropolitan Municipality, were collected on 26 July 2013. [more…]

TENDER RESULTS

The proposals for the tender for the construction of the Polatlı - Konya Line Section High Speed ​​Train Project, signaling, telecommunication, GSM-R and Ankara CTC control center and maintenance of the subsystems were collected.

TCDD Polatlı - Konya Line Section High Speed ​​Train Project Signalization, telecommunication, GSM-R and Ankara CTC control center construction and sub-systems maintenance tender bids have been collected. It will be carried out by the General Directorate of Turkish State Railways (TCDD), "Polatlı - [more…]

TENDERS

Tender Announcement: Study Project Service

Survey Project Service Will Be Taken İZMİR METROPOLITAN MUNICIPALITY BANLİYÖ SYSTEMS BRANCH OFFICE Station, Highway Overpasses and Highway Culvert Passages Implementation Projects between Tepeköy-Selçuk within the Scope of İzmir Suburban System Procurement of Service Procurement of Services No 4734 Public Tender [more…]

Related Articles and Advertisements