Mecidiyeköy-Mahmutbey Metro Line project will be tendered in September

The tender for the Mecidiyeköy-Mahmutbey Metro Line project will be held in September: It was announced that the Mecidiyeköy - Mahmutbey Metro Line project will be put out to tender on September 18, 2013, with the project, the distance between Mehmutbey and Mecidiyeköy will be reduced to 26 minutes.

According to the statement made by the Istanbul Metropolitan Municipality, the tender for the Mecidiyeköy-Mahmutbey Metro Line project will be held on September 18.

Mecidiyeköy-Mahmutbey Metro Line, Warehouse-Maintenance Area and Warehouse Connection Lines Construction Work, which includes Şişli, Kağıthane, Eyüp, Gaziosmanpaşa, Esenler and Bağcılar, has been awarded an international tender.

The tender for the construction of the line whose project work was completed was published in the Public Procurement Authority and the European Union bulletin. Many large domestic and foreign construction companies started to show interest in the tender.

The metro, which will be a solution to the traffic problems of Şişli, Kağıthane, Eyüp, Gaziosmanpaşa, Esenler and Bağcılar, will start integrated with the Hacıosman-Yenikapı Metro in Mecidiyeköy. The project, which will be integrated into the Edirnekapı-Sultançiftliği Line in the Black Sea Neighborhood by passing through Çağlayan, Kağıthane, Nurtepe Alibeyköy regions, will pass through Tekstilkent and Yüzyıl Neighborhood and merge with Mahmutbey-Başakşehir Metro, which was opened last month in Mahmutbey.

70 THOUSAND PEOPLE WILL BE TAKEN

The line, which scanned dense areas in terms of business and settlement, later on from Mecidiyeköy KabataşIt is also planned to be extended to. Mecidiyeköy-Mahmutbey Metro Line, which is approximately 17,5 km long, will carry 70 thousand people in one direction per hour. The project, which will include viaducts as well as tunnels, will consist of a total of 15 stations of drilling, cut-and-cover and viaduct types.

Mecidiyeköy, Çağlayan, Kağıthane, Nurtepe, Alibeyköy, Yeşilpınar, Veysel Karani, Akşemsettin, Kazım Karabekir, Yenimahalle, Karadeniz Mahallesi, Tekstilkent, Yüzyıl Mahallesi, Göztepe and Mahmutbey stations will be completed in 26 minutes from Mecidiyeköy to Mahmutbey.

When the metro networks in Istanbul are completed Mahmutbey-Sarıyer-Hacıosman 45 minutes, Mahmutbey-Yenikapı 39,5 minutes, Mahmutbey-Üsküdar Marmaray 48,5 minutes, MahmutbeyKadıköy Marmaray 52 minutes, Mahmutbey-Sabiha Gökçen Airport Marmaray 95,5 minutes, Çağlayan-Gaziosmanpaşa 13 minutes, Mecidiyeköy-Alibeyköy 7,5 minutes.

The tender for the metro line between Mecidiyeköy and Mahmutbey will be held on Wednesday, September 18, 2013, at 11.00:XNUMX in the municipality's Merter Additional Service Building Auction Hall.

Be the first to comment

Leave a response

Your email address will not be published.


*