Bursa-Ankara road opens before the festival

Bursa-Ankara road opens to transportation before the holidays: Drivers who have been directed to different routes due to rail system works in Bursa for a long time are finally getting rid of this trouble. Following the asphalting works to be completed in 10 days, uninterrupted transportation on the Ankara road will begin before the festival.

Mayor Recep Altepe, asphalting work continues quickly, stating the pre-Bayram intersection by opening the lower roads will prevent the agglomeration of traffic, he said.

Mayor Recep Altepe, accompanied by the Secretary-General Seyfettin Avsar, Deputy Secretary General Bayram Vardar and Mustafa Altın supervised the ongoing work at the intersection with the department chiefs.

Stating that the work on the Kestel Junction, which was built in parallel with the Bursaray Kestel Line project, is about to be completed, President Altepe said that the lower roads of the Kestel Junction, which eliminates another signaling system on the Ankara road and will provide uninterrupted transportation, will be completed in 10 days and will be opened before Ramadan Feast. told.

Stating that the first layer asphalting works have started on the Ankara departure direction of the intersection, Mayor Altepe said, “All the works on the road except asphalting have been completed. We mobilize all our teams and speed up the asphalting works. We aim to complete the roads under the intersection as soon as possible and open them to traffic before Bayram. In this way, our citizens who went to Ankara direction due to Bayram and came to Bursa from Ankara direction will not have to enter the secondary roads that are still used. It will continue on its way without interruption, ”he said.

Source : http://www.pirsushaber.com

Be the first to comment

Leave a response

Your email address will not be published.


*