Xanthus bridge to Bostanli and Cigli streams

Xanthus bridge to Bostanli and Cigli streams
IZMIR Metropolitan Municipality made a tender for the construction of 6 highway bridge in order to provide uninterrupted and convenient transportation on Bostanli and Cigli rivers.


During the construction of the highway bridges that will be completed in total 150 days after the finalization of the tender and the delivery of the place, it was announced that some parts of the stream beds will be expanded by making them suitable for the zoning plan.
. Within the scope of this project, the Metropolitan Municipality will make a 8022 meter-long 1 meter 2 17.5 17 2 2 4 band bridge next to the existing 5 strip bridge on the 30 / 15 Street section of Çiğli Creek. The traffic congestion in the region where İZBAN Çiğli Station and the transfer center are located will be relieved by the new bridge. In the part between Bostanli Stream and Gün Sazak Boulevard and İZBAN line, 2 highway bridge will be constructed. 6 XNUMX meters long XNUMX striped bridge with XNUMX meter length in Yusuf Nalkesen Street section of Bostanlı Stream, again with Yusuf Nalkesen Street and XNUMX

142 16.5 lane bridge 10 meters long 2 meters long 1671 meters 10 19.5 2 1671 lanes 12 meters long 24 lane bridge 2 meters, 6153 lane bridge on the sea side of the 6154 meter 23 meter 12.5 meter wide XNUMX meter long XNUMX lane XNUMX meters long XNUMX meter wide highway bridge will be constructed between the bridge and Gün Sazak Boulevard between XNUMX Street and XNUMX Street.

Source : the site www.hurriyet.com.tr



conversation

Be the first to comment

Comments