Rail System Review

Rail System Review
Metropolitan Municipality Mayor Mehmet Özhaseki, ongoing construction of the rail system 2. and 3 stage studies.

The Mayor Özhaseki, who examined the works in the Beyazşehir-İldem and the University-Talas line along with the relevant municipal authorities, received information about both the point reached and the works to be carried out in the following days.

After the visit, Mayor Özhaseki, who listened to the informational presentation of Arif Emecen, Head of Transportation Department on the subject at the Talas construction site, said that the works were progressing very rapidly and that the trial runs were planned to start at the end of this year.

Stating that with the completion of the 9 km Beyazşehir-İldem line and the 7.5 km Talas line, the length of the rail system in the city will reach 34 km, President Özhaseki said that a citizen living in İldem can go to the OIZ with a single ticket, which is a great opportunity. told.

Be the first to comment

Leave a response

Your email address will not be published.


*