3 will close the year due to the busiest street in Istanbul

3 will close the year due to the busiest street in Istanbul
As part of the ongoing metro works in Ümraniye, Alemdağ Street will be closed to traffic for 26 years starting from May 2013, 3. Vehicles passing through Alemdağ Street, known as one of the busiest streets of Istanbul, are expected to be directed to different directions.

Due to the construction of Üsküdar-Ümraniye-Çekmeköy-Sancaktepe metro, Alemdağ Street will be closed to traffic for three years.

The construction of the station for the second subway of the Anatolian side of Istanbul Metropolitan Municipality is being started. For the Üsküdar-Ümraniye-Çekmeköy-Sancaktepe subway, which will be completed in record time, Ü Ümraniye dar station is going to be excavated. According to the statement made by the municipality, Alemdağ Street will be closed for three years in front of the old building of Ümraniye Municipality due to the excavation works of the station.

Alternative roads were planned to be closed to traffic between Alemdağ Caddesi Suiş Cadesi Intersection and Alemdağ Caddesi-Sütçü İmam Street connection. Temporary traffic circulation during work will be:

“- Vehicles that want to go to Çamlıca or Libadiye Junction in the direction of Alemdağ Caddesi from Tepeüstü direction; They will be able to reach Libadiye Junction by using the Alemdağ Street-Suiş Street-Menteşoğlu Street-Alemdağ Yanyol route.

  • On the other hand, the vehicles that want to go to Tepeüstü by using the Natoyolu Street (Mehmet Akif Ersoy Avenue) come from Çengelköy direction. Alemdağ Yanyol-Alemdağ Caddesi and Sütçü İmam Street Route.
  • From the Libadiye Junction and using Alemdağ Street and Sütçü İmam Street, Tepeüstü

There will be no change for drivers who want to go to their destination.

  • On the 26.05.2013, the work to begin at 00.00 is planned to last for three years.

LINE HEADS IN METRO CONSTRUCTION

  • It will be extended from Taşdelen and Sultanbeyli to Sabiha Gökçen Airport.
  • Travel times will decrease with safe and comfortable travel

  • The average 33 minutes per travel per passenger will be earned.

  • Üsküdar-Ümraniye-Çekmeköy-Sancaktepe Metro Line (When Marmaray, Yenikapı-Hacıosman Metro Line is completed) A passenger riding from Sancaktepe metro; 12,5 minutes to Ümraniye, 24 minutes to Üsküdar,

  • 36 minutes to Yenikapı, 44 minutes to Taksim, 68 minutes to Hacıosman

    Ataturk Airport will reach 71 in minutes.

    • With the introduction of the Metro line, both national economy and individuals will provide significant economic savings;
  • Operational costs of public transport such as buses and minibuses will decrease,

  • Fuel consumption and maintenance costs will decrease,

  • It will reduce the number of traffic accidents and prevent life losses.

  • Repair costs will decrease with the decrease of accidents

  • Road maintenance and repair costs will decrease with the decrease of investment needs,

  • The amount of harmful gases and environmental pollutants (dust, noise, etc.) released by motor vehicles into the atmosphere will be significantly reduced.

  • The decrease in CO2 emission released into the atmosphere in one year will be 77 thousand 246 tons.

  • TECHNICAL PROPERTIES OF METRO LINE

    • Line Length: 20 km
  • Number of Stations: 16

  • Construction Time: 38 month

  • Metro vehicles, Kadıköy-It will be used without a mechanic like in Kartal Metro

  • Source : gundem.milliyet.com.t is

    Armin

    sohbet

      Be the first to comment

      Comments