Change in Eskişehir Tram Line Project

Change in Eskişehir Tram Line Project
Yunus City Site inhabitants reacted to the fact that the Emek-71 Homes Line, which is currently working on the extension of existing tram lines in Eskişehir, will pass through Gülkan Street in the Yenidoğan Quarter.

A group of citizens gathered on the street, "We do not want a tram" slogan.

Mete Ölç made a statement on behalf of the residents of the site, without consulting the residents of the Metropolitan Municipality of Eskisehir Metropolitan Municipality and said that the line is carrying to the street.

According to the previous plan, the line 1. Emphasizing that it should pass through Cold Demirciler Street, Meas., Said:

X The width of our street is 7 meters, 1 before the plan is changed. Even though the width of the Cold Iron Street is 20 meters, it has been replaced by our street with 7 meters on the pressure of some people. This path uses 248 digits. The entrance of the 4 block is made from this street. Residents of the site are victims. Authorities are waiting for your attention. We are also considering filing a lawsuit against the Eskişehir Regional Administrative Court. Municipal authorities in vain here to begin excavation and processing. I think the decision to stop the execution will be taken.

Similar Railway News

Similar High Speed ​​Train News

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.