TCDD 1. Region Arifiye - Pamukova 2. Line Project Elections for the construction of electrification and the rehabilitation of the existing line were collected in accordance with the speed of 160 km / h

Turkish State Railways (TCDD) 1. Regional Directorate of Arifiye - Pamukova 2. The proposals of the tender for the 160 km / h Speed ​​Electrification and Rehabilitation of the Existing Line were collected on 15 April 2013.

According to the information received by the Investments Magazine; firms and their bids (¨) were determined as follows:

  1. Emre Ray Energy 7.222.917
  2. E + M Electric - Aykon Electric 8.490.000
  3. Sanvar Construction - Detvar Construction 8.729.895
  4. Ultra Technology 8.888.000
  5. Usluel Energy 9.334.715
  6. Savronik System 11.820.000
  7. İnabensa Construction Energy 13.909.003

Source : Investments

Similar Railway News

Similar High Speed ​​Train News

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.