3. feet of bridge ready

  1. the feet of the bridge are ready! : Construction of the 3rd bridge between Sarıyer's Garipçe Village and Beykoz Poyrazköy continues. It was seen that the pile holes of the bridge were opened.

In the tender, which was concluded on May 29, 2012, the İçtaş-Astaldi partnership awarded the tender for the Odayeri-Paşaköy Section (including the 3rd Bosphorus Bridge) of the 'North Marmara Motorway Project', which includes the construction of the 3rd Bridge to be built on the Bosphorus. kazanhad been.

Ictas-Astaldi, 10 year 2 month including partnership construction and operation time had given 20 daily bid.

The second largest highway project in Turkey Northern Marmara Motorway, which will be held in Istanbul 3 housed within the bridge.

The cost of the 3-kilometer-long project that will connect Adapazarı to Tekirdağ over the 414rd bridge to the Bosphorus reaches 6 billion dollars, including the expropriation cost.

The third bridge is expected to be put into service at the end of 2015.

İçtaş İnşaat- Astaldi Joint Venture Group has to complete the project in 36 months as per the tender contract.

Similar Ads

Be the first to comment

Comments