3. bridge auction ended (PRIVATE NEWS)



  1. The bridge auction resulted. Transport Minister Binali Yıldırım 3. He announced the company that won the bridge tender.
  2. The bridge auction resulted. According to this, the tender made by Build-Operate-Transfer model was won by İçtaş Construction Industry Trade Inc.-Astaldi Joint Venture Group.

Binali Yıldırım, Minister of Transport, Maritime Affairs and Communications, will be built on the Bosphorus. In the tender of İnşaat Odayeri-Paşaköy Section of the Northern Marmara Motorway Project di including the construction of the bridge, the shortest construction and operation period was announced by İçtaş Construction Industry Trade Inc.-Astaldi Joint Venture Group with 3 year 10 month 2 days.

Minister 3 has announced that the amount of investment for the bridge is 2,5 billion dollars (approximately 4,5 billion TL), but this figure may increase or decrease. He said the bridge would be finished by 3 in the year. Minister Yıldırım said that they hoped the construction would start as soon as possible, and that the bridge and highway would be put into service at 2015.

Minister of Transport, Maritime Affairs and Communications Yıldırım

Binali Yıldırım, Minister of Transport, Maritime Affairs and Communications, will be built on the Bosphorus. In the tender of the Ortak Northern Marmara Motorway Project ini including the construction of the bridge, the shortest operating time including the construction period is 3 year 10 month 2 day with İçtaş Construction Industry Trade Inc.-Astaldi Joint Venture Group said.

3 to be built on the Bosphorus. the proposals of the partnerships that offer the tender for the Odayeri-Paşaköy (including 3. Bosphorus Bridge) Section of the Northern Marmara Motorway Project, including the construction of the bridge, were announced.

Minister Yıldırım, the press conference after the announcement of the proposals, including the duration of the shortest operating time 10 year 2 month 20 days with the Innovative Construction Industry Trade Inc.-Astaldi Joint Venture Group said.

Company representatives were invited to the 24 in May and reminiscent of the proposals opened in the Lightning, all the details are examined and the third bridge design of the Salini-Gulermak Joint Venture was determined that the design is not specified.

Yildirim said the design in question was foreseeing that the bridge's feet were in the sea, and that it was not in accordance with the specifications. Therefore, he said that the initiative group was eliminated.

The cost of the project will find about 4,5 billion pounds and 36 is expected to be completed in the month stating that the Lightning, the 2015 XNUMX said they aim to start to serve in Istanbul at the end of the year.

Yildirim, Cengiz Construction, Kolin Construction, Limak Construction, Makyol Construction, Kalyon Construction Joint Venture Group 14 year 9 19 XNUMX said that the day of the operating time.

Source: Morning

Ads

High Speed ​​Train News



Railway Tenders of the Week

20 / 05 / 2019 for events week

This Week Navigation

loading Events
Sat 25
No Events Found
Sun 26
No Events Found

Free Email Subscription

your email adress:

Be the first to comment

Yorumlar

This site uses Akismet to reduce spam. Learn how your comment is processed.