Projects that will change the face of Istanbul

Projects that will change the face of Istanbul
Istanbul Metropolitan Municipality, the city's traffic problem started to finish the metro, roads, tunnels and intersections of the intersection continues without slowing down. The projects that will be completed in the 2013 or still continue to solve the transportation problems, but also increase the housing prices in the surrounding regions. He compiled these projects for you.

ÜSKÜDAR-ÜMRANİYE-ÇEKMEKÖY (SANCAKTEPE) METRO CONSTRUCTION
APPLICATION PLACE: ÜMRANİYE - ÜSKÜDAR START
FINISH YEAR: 2010-2015

KARTAL-KAYNARCA METROSU CONSTRUCTION
APPLICATION PLACE: PENDİK - KARTAL
STARTING END YEAR: 2013-2015

ISTANBUL OTOGAR-BAGCILAR-OLYMPIC VILLAGE
APPLICATION PLACE: ESENLER - BAĞCILAR - BAŞAKŞEHİR
STARTING END YEAR: 2005-2013

HALİÇ METRO TRANSITION BRIDGE CONSTRUCTION
APPLICATION: FATİH
STARTING END YEAR: 2012-2014

TAKSIM-YENIKAPI RAIL SYSTEM ENGINEERING AND CONTROLLING SERVICES
APPLICATION PLACE: BEYOĞLU - FATİH
STARTING END YEAR: 1995-2014

BAKIRKÖY-KÜÇÜKÇEKMECE-AVCILAR-BEYLİKDÜZÜ METROSU ENGINEERING OPERATIONS
APPLICATION PLACE: AVCILAR - KUCUKCEKMECE - BUYUKCEKMECE - BAHCELIEVLER - BAKIRKOY
STARTING END YEAR: 2010-2015

BAKIRKÖY-BAHÇELİEVLER-BAĞCILAR (KIRAZLI) METRO LINE CONSTRUCTION
APPLICATION: BAGCILAR
BAHÇELİEVLER - BAKIRKÖY
STARTING END YEAR: 2010-2015

KABATAŞ-BEŞİKTAŞ-MECİDİYEKÖY-KAĞITHANE-ALİBEYKÖYGAZİOSMANPAŞA-TEKSİTİLKENT-MAHMUTBEY METRO CONSTRUCTION
PLACE OF APPLICATION: ESENLER - EYÜP - BAYRAMPAŞA - ŞİŞLİ - BEYOĞLU - GAZİOSMANPAŞA - BEŞİKTAŞ - BAĞCILAR-KAĞITHANE
STARTING END YEAR: 2010-2015

YENİKAPI-İNCİRLİ METRO LINE
APPLICATION PLACE: FATİH - BAKIRKÖY
STARTING END YEAR: 2010-2015

İSTANBUL METROSU UNKAPANI-YENİKAPI CONSTRUCTION
APPLICATION: FATİH
STARTING END YEAR: 1998-2014

ÜMRANİYE-ATAŞEHİR FINANCE CENTER - KOZYATAĞI RAYLI SYSTEM PROJECT
APPLICATION PLACE: ÜMRANİYE - KADIKÖY - ATAŞEHİR
STARTING END YEAR: 2012-2015

BÜYÜKÇEKMECE D-100 KARAYOLU ÜZERİ BIMIMKIR BRIDGE ROAD ROAD, JUNCTION CONSTRUCTION
APPLICATION LOCATION: BÜYÜKÇEKMECE
STARTING END YEAR: 2012-2013

SİLİVRİ GÜMÜŞYAKA D-100 HIGHWAY MUNICIPALITY
FRONT ROAD CONSTRUCTION
APPLICATION: SİLİVRİ
STARTING END YEAR: 2012-2013

EYÜP, AYVANSARAY CAD. CONSTRUCTION OF D-100 CONNECTION ARM
APPLICATION: EYÜP
STARTING END YEAR: 2012-2013

MALTEPE BASIBÜYÜK-SAMANDIRA ROAD, JUNCTION CONSTRUCTION
APPLICATION PLACE: MALTEPE - SANCAKTEPE
STARTING END YEAR: 2012-2014

MAHMUTBEY BATI JUNCTION - BAHÇEŞEHİR TEM NORTH, SOUTH SIDE ROADS ONE WAY APPLICATION (TEM ÜSTGEÇİT İNŞ.)
APPLICATION: BAGCILAR
STARTING END YEAR: 2012-2013

KÜÇÜKÇEKMECE, SAKARYA CAD., HALKALI MEYDANI (İKİTELLİ CADDESİ) ROAD, KAVŞAK İNŞ.
APPLICATION: KÜÇÜKÇEKMECE
STARTING END YEAR: 2012-2013

KUCUKCEKMECE, ISTANBUL CAD., YARIMBURGAZ CAD. ARASI YOL, KAVŞAK CONSTRUCTION.
APPLICATION: KÜÇÜKÇEKMECE
STARTING END YEAR: 2012-2013

BAHÇELİEVLER, ÇOBANÇEŞME JUNCTION E-5 SIDE ROAD CONDITION ROAD, KAVŞAK İNŞ.
APPLICATION: BAHÇELİEVLER
STARTING END YEAR: 2012-2013

BAKIRKÖY, WORLD TRADE CENTER - ROAD BETWEEN COAST ROAD, KAVŞAK İNŞ.
APPLICATION: BAKIRKÖY
STARTING END YEAR: 2012-2014

AVCILAR, FİRUZKÖY TAHTAKALE ROAD CONSTRUCTION
APPLICATION PLACE: AVCILAR
STARTING END YEAR: 2012-2013

BAYRAMPAŞA, TUNA CAD.-YAHYA KEMAL CAD.
ROAD, CROSS CONSTRUCTION
APPLICATION: BAYRAMPAŞA
STARTING END YEAR: 2012-2014

BASAKSEHIR 4th STAGE - OLD EDIRNE ROAD BETWEEN ASPHALT, INTERSECTION CONSTRUCTION
APPLICATION: BAŞAKŞEHİR
STARTING END YEAR: 2012-2014

TAKSIM SQUARE ARRANGEMENT CONSTRUCTION
APPLICATION: BEYOĞLU
STARTING END YEAR: 2012-2013

ARNAVUTKÖY MUNICIPAL BUILDING - ROAD CONSTRUCTION BETWEEN TAYAKADIN
APPLICATION: ARNAVUTKÖY
STARTING END YEAR: 2012-2013

SULTANGAZİ ATATÜRK BULVARI MEYDAN ARRANGEMENT CONSTRUCTION
APPLICATION: SULTANGAZİ
STARTING END YEAR: 2013-2014

THE TIME BETWEEN THE SAMANDIRA JUNCTION AND KURTKOY TEM
NORTH - SOUTH SIDE ROADS CONSTRUCTION
APPLICATION: SULTANBEYLİ
STARTING END YEAR: 2013-2014

CONSTRUCTION OF TEM NORTH - SOUTH SIDE ROADS BETWEEN KURTKOY JUNCTION AND SUGARPINAR JUNCTION
APPLICATION: TUZLA
STARTING END YEAR: 2013-2014

SARIYER - BAHÇEKÖY - MINE CONNECTION ROAD, ROAD AND INTERSECTION CONSTRUCTION
APPLICATION: SARIYER
STARTING END YEAR: 2013-2014

GAZİOSMANPAŞA, METRIS JUNCTION - CONSTRUCTION OF TEM SOUTH SIDE ROAD AND JUNCTION BETWEEN EUROPEAN RESIDENCES
APPLICATION: GAZİOSMANPAŞA
STARTING END YEAR: 2013-2014

ARNAVUTKÖY ÇİLİNGİR YOLU - MEHMET AKİF AVENUE ROAD AND INTERSECTION CONSTRUCTION
APPLICATION: ARNAVUTKÖY
STARTING END YEAR: 2013-2014

ARNAVUTKÖY HARAÇÇI - HADIMKÖY CONNECTION ROAD AND INTERSECTION CONSTRUCTION
APPLICATION: ARNAVUTKÖY
STARTING END YEAR: 2013-2014

ARNAVUTKÖY HARAÇÇI - HADIMKÖY CONNECTION ROAD AND INTERSECTION CONSTRUCTION
APPLICATION: ARNAVUTKÖY
STARTING END YEAR: 2013-2014

ALTINŞEHİR SQUARE AND ENVIRONMENT (AZATLI RIVER) ROAD AND JUNCTION CONSTRUCTION
APPLICATION: BAŞAKŞEHİR
STARTING END YEAR: 2013-2013

BEYKOZ, RİVA DERESİ TRANSITION BRIDGE AND ROAD REHABILITATION CONSTRUCTION
APPLICATION: BEYKOZ
STARTING END YEAR: 2013-2014

TUZLA AYDINTEPE ROAD - SABİHA GÖKÇEN AIRPORT ROAD CONSTRUCTION
APPLICATION: TUZLA
STARTING END YEAR: 2013-2014

KAĞITHANE CENDERE ROAD ROAD AND JUNCTION CONSTRUCTION
APPLICATION: KAĞITHANE
STARTING END YEAR: 2013-2014

ESENYURT, CONSTRUCTION OF DOĞAN ARASLI BULVARI (STREET STONE) CONSTRUCTION
APPLICATION: ESENYURT
STARTING END YEAR: 2013-2014

KÜÇÜKÇEKMECE, HALKALI SQUARE ALTGEÇİT CONSTRUCTION
APPLICATION: KÜÇÜKÇEKMECE
STARTING END YEAR: 2013-2013

BÜYÜKÇEKMECE TEM HIGHWAY - D-100 HIGHWAY CONNECTION ROAD
APPLICATION LOCATION: BÜYÜKÇEKMECE
STARTING END YEAR: 2013-2014

KADIKÖY BOSTANCI TÜNEL CAD. - KAYIŞDAĞI CAD. CONSTRUCTION OF ROADS AND INTERSECTIONS
APPLICATION: KADIKÖY
STARTING END YEAR: 2013-2014

ÜSKÜDAR-ÜMRANİYE-ÇEKMEKÖY METROSU CONSTRUCTION
APPLICATION PLACE: ÜMRANİYE - ÜSKÜDAR
STARTING END YEAR: 2010-2015

KARTAL-KAYNARCA METROSU CONSTRUCTION
APPLICATION: KARTAL- PENDİK
STARTING END YEAR: 2012-2015

Source : www.sabah.com.t is

Armin

sohbet

    Be the first to comment

    Comments