Bursa high-speed train arrives rapidly 59 ends year-long craving

Bursa high-speed train arrives rapidly 59 ends year-long craving
Bursa-Mudanya Line is closed with a law in the 1953 and then dismantled with the iron network disconnected Bursa, 59 year longing ends.
Turkey's most important industry, textile and tourism centers to provide rail links to the East-West axis of Bursa, one of the 105-kilometer Istanbul high-speed train Line's 75-kilometer section forming the Bursa-Yenisehir basis of stage 23 December 2012 Sunday day being taken at 13.00:XNUMX .
Deputy Prime Minister Bülent Arınç, Minister of Transport, Maritime Affairs and Communications Binali Yıldırım and Labor and Social Security Minister Faruk Çelik will be together with the groundbreaking ceremony in Bursa-Mudanya Yolu Balat Mahallesi Mevkii. Hat, the travel time between Ankara-Bursa 2 hour 10 minutes, travel time between Istanbul-Bursa 2 hours will reduce to 15 minutes. The line, which is built according to the latest high-speed train technology and 250 speedometer, which can be operated together with passenger and freight trains, will provide a significant alternative transportation to the industry of the region by providing the railway connection of Bursa to İzmir and ports via Balıkesir. The line is scheduled to be put into service in 2016.
In the Bursa-Yenişehir stage, which constitutes 105 kilometers of the 75-kilometer Bursa high-speed train Line, 15 tunnels with a length of 11 kilometers, 1140 m. 3 cut-and-cover tunnels in length, 6840 viaducts with a length of 8 meters, 358 bridges with a length of 7 meters, 42 underpasses and overpasses, 58 culverts in total will be built. Approximately 143 million 10 thousand cubic meters of excavation and 500 million 8 thousand cubic meters of filling will be carried out.
Approximately 20 will be produced equivalent to the size of a city where a thousand people can live.

Source : www.bursahakimiyet.com.t is

Armin

sohbet

Be the first to comment

Comments