Ankara Istanbul High Speed ​​Train Project (Video)

Ankara Istanbul High Speed ​​Train Project
The Ankara Istanbul Express Train Project includes the new 533 km long 250 km / h speed independent, all-electric and signal-free new double-track high-speed railway construction.
Upon completion of the project, the 3 will be opened between Ankara and Istanbul. 10 with a share of the 78 of the passenger transport on this route is aimed to increase the percentage of 8. 6 in Europe. fast train operator will become a country. With this project, which connects the two largest cities of our country, social, economic and cultural shopping will increase between the cities and will be ready with the transportation infrastructure of our country which is in the process of membership of the European Union.
The project 10 consists of separate parts;
• Ankara-Sincan: 24 Km
• Ankara-High Speed ​​Train Station
• Sincan-Esenkent: 15 Km
• Esenkent-Eskişehir: 206 Km
• Eskişehir Railway Station
• Eskişehir-İnönü: 30 Km
• Inonu-Vezirhan: 54 Km
• Vezirhan-Köseköy: 104 Km
• Köseköy-Gebze: 56 Km
• Gebze-Haydarpaşa: 44 Km
Ankara Istanbul Fast Train Project will be completed in two stages. The first stage of the project, the Ankara-Eskişehir High Speed ​​Train Line, was launched in 2009. The second phase of the project, the Eskişehir Istanbul line, is under construction. The foundation of Köseköy-Gebze Stage was laid on 28.03.2012.
The Gebze-Haydarpaşa section of the line will be transformed into surface metro with the Marmaray Project.
Sincan-Esenkent and Esenkent-Eskişehir Lines were opened.




conversation

Be the first to comment

Comments