President Altepe (T1) examined the construction of the tram line

Bursa Metropolitan Municipality has started the construction works in the Sculpture-Garage (T1) Tram Line, which is designed to provide comfortable transportation with the city center.
Metropolitan Mayor Recep Altepe started the construction works on the T1 tram line which will run between the Sculpture and the Garage. President Altepe, Metropolitan Municipality Consultant Fahreddin Yildirim and BURULAS General Manager Levent Fidansoy with the marking work on the stadium examined the site. Mayor Altepe stated that they are trying to solve the transportation problem in Bursa with rail system investments as in the modern cities and said ık We continue our works with the aim of reaching Bursa as an accessible municipality. This period is the most important issues, rail system lines and transportation, to bury Bursa with iron nets. We started the construction of the tram line which will operate on the Garage, Stadium Street, Altiparmak Street, Sculpture and Inonu Street, which we call the line named 1. X Reminding that every corner from the east to the west, Beşevler to İhsaniye will be connected to each other by rail system investments, Mayor Altepe said, ac Approx. We want to complete our work in a healthy way as soon as possible Çalış. Altepe, T2 tram line will be connected to the line of the Çekirge Street, stating that, ağ We aim to complete this first line of work as soon as possible. We're not going to work at one point. We want to finish this study in 2,5 months or even earlier. We will work at 1 points, including Atatürk Street and Ulu Cadde, as well as Stadium Street. Stadyum On the Stadium Street, both wheeled vehicles and tram will work in partnership Altepe Altepe, infrastructure, displacement studies will continue in a coordinated manner, stressing that the lines will be laid in series,, Upon completion of these studies Bursan's showcase, vision will be changed in a short time. Bursa will be a contemporary European city with rail systems le. President Altepe, 10 km-long route, along with the 3 stop the tram line, as well as Terminal and other rail system lines, the project continues to work, he said. There will be 6,5 station along the Tram Street Caddesi-Altıparmak Street-Atatürk Street-Heykel-İnönü Caddesi-Kıbrıs Şehitleri Street-Kent Square-Darmstad Street.

Source : www.ekohaber.com.t is

Armin

sohbet

    Be the first to comment

    Comments