Bursa Map | BursaRay Route

bursaray map and guzergahi
bursaray map and guzergahi

BursaRay Map: BursaRay route, Mudanya Road in the labor station and west from the university starting at the Acemler station. Afterwards, following Ankara Road, he goes to Şehreküstü Square from the City Square and follows Haşim İşcan Street and ends on the viaduct again on the way to Ankara and ends at the Arabayatağı Station.

Station Locations
BursaRay 1. In Steps A and B, there are a total of 5 stations, 23 underground. The total length of the two-lane route is 22,043 km and completely independent of the highway. Small Industry, Ataevler, Beşevler, Fatih Sultan Mehmet and Nilüfer Stations are located on İzmir road (West Line), while Organized Industry, Hamitler-Fethiye, Bağlarbaşı-Esentepe, İhsaniye and Karaman Stations are located on Mudanya Road (North Line). In the direction of Ankara (East Line) after the combination of two lines, respectively; Acemler, Pasa Farm, Rowhouses, Culture Park, Merinos, Osmangazi, Şehreküstü, Demirtaşpaşa, Gökdere, Davutdede, Duaçınarı, Yüksek İhtisas Hospital and Arabayatağı Stations.

BursaRay 2. There is a total of 1 stations in the Stage of University. Even the station names, whose length is 6 km, are as follows: University, Batıkent, Yüzüncüyıl, Özlüce, Ertuğrul and Altınşehir. In the extension of Mudanya Road, there is a total of 6,622 stations with 1 underground. Even the station names with the length of 2 km are as follows: Korupark and Emek.

Construction Lines
BursaRay 8 which consists of 7 km and 3 stations that will connect the Carriage Station to Kestel. A groundbreaking ceremony was held in 30.07.2011 history for stage studies.

BursaRay Map (As of 2018)


BursaRay Map: BursaRay route, Mudanya Road in the labor station and west from the university starting at the Acemler station. Afterwards, following Ankara Road, he goes to Şehreküstü Square from the City Square and follows Haşim İşcan Street and ends on the viaduct again on the way to Ankara and ends at the Arabayatağı Station.

Line Length (Double Line) 39 km
Warehouse Lines 9,9 km
Number of Stations 38 (7 Pieces Underground)
Energy Type 1500 V DC
Energy Feed Type Catanery
Maximum Speed 70 km / h
Rail Width 1435 mm
Minimum Horizontal Curve 110 m
Platform Height 120 m

Bursaray Interactive Route Map:

Similar Railway News

Similar High Speed ​​Train News

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.