Ankara's Cayyolu subway operation resumes

Due to the construction work on the Çayyolu subway, a difficult day is waiting for the construction of the Ankara residents.
The construction of the metro connecting Çukurambar and Söğütözü was started in Ankara and the street was closed to traffic for 4 months. The drivers coming from Konya Road and going to Çukurambar will use Ufuk University Street and those who come from Kızılay will reach the targets by going to Ufuk University Street by crossing the İnönü Bulvarı - Konya Highway at the bridge junction.
The entrance between the exit of Necatibey Street and the General Directorate of State Hydraulic Works (DSİ) will be the closure of İnönü Boulevard, which will significantly affect the flow of traffic. 85 from left in front of the TSE. On the street, you will reach İnönü Boulevard. The Ministry of Transport, Maritime Affairs and Communications took over the construction of the subway construction of Kızılay - Çayyolu metro from Ankara Metropolitan Municipality.

Source: Emlakkulisi

Current Railway Tender Schedule

How 20
How 20
Salt 24

Tender Notice: Horizontal Life Line Will Be Purchased (TUDEMSAS)

September 24 @ 14: 00 - 15:00
Organizer: TÜDEMSAŞ
+90 346 2251818
Tsar 25

Announcement of Tender: Elevator Electro-Mechanical Works

September 25 @ 10: 00 - 11:00
Organizer: TCDD
444 8 233
Tsar 25
About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.