Üsküdar-Sancaktepe 'metro will be completed in 38 months

The foundation of Üsküdar-Ümraniye-Çekmeköy-Sancaktepe 'metro was laid. The 16-stop, 20-kilometer line will be completed in a record time of 38 months.
Binali Yıldırım, Minister of Transport, Maritime Affairs and Communications, said: Ulaştırma We started the work of the Kanalistanbul project. In this year, we will complete the geological surveys, route works and we will start expropriation studies. Bu
Yildirim, "Üsküdar-Umraniye-Cekmekoy-Sancaktepe" subway ceremony in his speech at the ceremony, the new investment in the hope would be auspicious auspicious.
Yıldırım pointed out that the words are not enough to describe Istanbul, and poet Necip Fazıl Kısakürek's "Canım Istanbul" poem, "The flower is golden gilding / The water is stranded, The moon and the sun are two Istanbul residents. / Istanbul is my dear / Homeland is my homeland ”.
Yıldırım said, “Let such good services be halal for Istanbul” and noted that he spent his youth and school years here, and that he pulled the mud and the suffering of the marshy roads.
Yildirim, pointing where it came from, water, sewer, road problems, while thinking about the subways were made here.
Minister Yıldırım continued his words as follows:
“The main opposition party leader says, 'We have thoughts for Istanbul'. Let's think a little more, how much will you think? Need a project in Istanbul, thought is not enough.Kanalistanbul project. You need a fast train between Istanbul and Ankara. You need a highway and a bridge between Istanbul and Izmir. Turkey is not only the world's leading projects are done one at a time. "
Yıldırım noted that Prime Minister Recep Tayyip Erdogan brought his salute.
Expressing that they have doubled the metro line they have taken over with 44 kilometers, Yıldırım is very soon with the commissioning of Marmaray at the end of next year. Kadıköy He emphasized that this figure will exceed 180 kilometers with the introduction of the Kartal metro line. Minister Yıldırım pointed out that this number will exceed 250 kilometers in a few years.
Expressing that they have realized 7 major projects only in Istanbul as the Ministry of Transport, Maritime Affairs and Communication, Yıldırım stated that one of them is the third Bosphorus Bridge and the second is the Ankara-Istanbul high speed train project.
Yıldırım noted that he would aim to finish the project, which will reduce the travel time between Ankara and Istanbul to under 3 hours, by the end of next year.
Stating that the third important project is Marmaray, Marmaray, which is a world project, is the only project in the world that passes at a depth of 63 meters from the bottom of the sea, Yıldırım said, “We will present it to Istanbul residents on 29 October 2013”.
Yıldırım also noted that they built a sister tunnel and the Eurasia Tunnel right next to Marmaray, and said that this tunnel will end in 2015.
Stating that the fifth important project is the airline project, Yıldırım stated that Atatürk Airport no longer responds to the need, and that Sabiha Gökçen Airport has reached the stage where it cannot respond to the demand.
'5 million people will be transported by the rail system'
Istanbul Metropolitan Mayor Kadir Topbaş said, “Currently, the 82-km rail system uses 1 million 372 thousand people. Hopefully when we reach 2014, 5 million passenger rail systems will be used. ”
Speaking at the groundbreaking ceremony of the tarih Üsküdar-Ümraniye-Çekmeköy-Sancaktepe ene subway, Topbas said that there was a historical day and that the participants of the ceremony are witnessing the history.
Tı Future generations will not remember us when we are using this metro, but we set out to serve humanity, dik said Topbas. Gel Since they took office, 52 has invested a billion liras, they said that 24 billion of these investments are about transportation.
Noting that they have implemented their planned transportation systems one by one, Topbaş said, “Currently, the 82-km rail system uses 1 million 372 thousand people. Hopefully when we reach 2014, 5 million passenger rail systems will be used. ”
The number of people living in the city is the movement of people in the city up to 3 times that transfer Topbas, so it is very important to establish the right transportation systems.
Noting that the tender for the third bridge was held on the instructions of Prime Minister Recep Tayyip Erdoğan, Topbaş stated that they focused on investments that provide mass transportation opportunities and that the amount of investments related to the metro is 10 billion liras.
Üsküdar-Ümraniya-Çekmeköy-Sancaktepe metro with 16 stations and 20 kilometers will be expressed in the Topbas, with the introduction of the service line of this metro line to enter the service of the region's traffic problem would be seriously relieved.
Topbas, 20 kilometer line will be completed in a record time, such as 38 monthly.
One of the features of this line, as in the Metro metro system, if necessary, without machines can work, when the need to go to the station by taking its own passengers, and then go to the storage area that expresses Topbas, the world's most advanced technology, he said.
Kadir Topbaş, Kartal they extended to KaynarcaKadıköy He stated that the test drives of the subway line were about to be completed and that he would be in service soon.
564 million euro investment
The rail line of Üsküdar-Ümraniye-Çekmeköy-Sancaktepe metro, which will be the second metro line of the Anatolian side, will be constructed as an underground tunnel. Metro line will cost 564 million euros.
Kadıköy-As in the Kartal metro line, the route and warehouse area of ​​the trains will be made without drivers in the entire Üsküdar-Ümraniye-Çekmeköy line.
With the Marmaray project, integration will be ensured at Üsküdar station, on the Metrobus line at Altunizade station, on the Bostancı-Dudullu metro line and at the Dudullu station, when the ongoing project line is completed.
Üsküdar-Sancaktepe 24 will go down in minutes
The line will consist of 20 mileage and 16 station, storage area and 2 bin 750 meter connection tunnels connected to the warehouse. Even the 126 wagon will serve. The construction of the warehouse area will be made within the scope of this work. Metro line will be completed in record time as 38 months. After the completion of the Metro, Üsküdar-Ümraniye-Çekmeköy-Sancaktepe will be landing in 24 minutes. The line will start integrating with Marmaray Üsküdar station and will end near Alemdağ Avenue and Şile Road Junction.
The metro line will include Üsküdar, Fıstıkağacı, Bağlarbaşı, Altunizade, Kısıklı, Libadiye, Çarşı, Ümraniye, İnkılap Neighborhood, Çakmak, Ihlamurkuyu, Altınşehir, Lise, Dudullu, Mass Housing, Çekmeköy and Sancaktepe stations.
Journey times from Çekmeköy-Sancaktepe will be Üsküdar 24, Kartal 59, Yenikapı 36, Taksim 44, Hacıosman 68, airport 68, and Olympic Stadium 78 minutes.

Be the first to comment

Leave a response

Your email address will not be published.


*