35 Izmir

Public Transport Investments in Izmir

The protocol for 100 buses to be purchased by İZULAŞ, one of the companies of İzmir Metropolitan Municipality, from Otokar was signed with a ceremony. According to the statement made by the Izmir Metropolitan Municipality, the protocol for the 100 buses to be purchased by İZULAŞ from Otokar at the historical Gas Factory [more…]

34 Istanbul

Binali Yıldırım: There will be a rail system on the bridge

There will be a rail system on the bridge: A railway rail system, which was not included in the first project, was added to the Third Bridge Project, which aims to reduce the traffic load of Istanbul and Marmara Region. Binali Yıldırım, Minister of Transport, Maritime Affairs and Communications, cost about 4.5 billion [more…]

WORLD

Ukrainian railways, 27 across the globe. Ranked

In the rating of “The Global Enabling Trade Report 2012” made by the World Economic Forum, Ukraine's railways ranked 27th in terms of quality in the world ranking. Turkey's ranking is # 61 in the railways. To the statement made by the General Directorate of Railways of Ukraine [more…]

WORLD

Signs Tülomsaş Rail Systems Protocol with ESOGÜ

Eskişehir Osmangazi University (Eskisehir Osmangazi) with refurbishments and Turkey Locomotives Motor Industry Co. (TÜLOMSAŞ) signed a protocol concerning rail systems and aiming cooperation on all subjects including R & D and training. In the statement made by the protocol, R & D studies [more…]

11 Bilecik

Logistics Village Project Tender Concluded in Bozüyük

It has been reported that the Logistics Village Center project tender planned to be built in Bilecik's Bozüyük district has been finalized. It was stated that the Assignia-Elit Proje joint venture won the tender in which 14 companies participated. The bids of which were collected on 31 January 2012 by the General Directorate of Turkish State Railways (TCDD), [more…]

34 Istanbul

3 50 will create business for one thousand people

Minister of Transport, Maritime Affairs and Communications Binali Yildirim, will find about 4.5 billion pounds 3 UM 6 thousand people during the construction phase of the 7 bridge, 700-1000 people in the operation phase, 50 thousand people will be employed in the construction process, he said. Yıldırım, “Bridge, [more…]