3rd bridge tender reaches the last 3

The number of companies competing in the tender of 'Northern Marmara Motorway Project's Odayeri-Paşaköy Section', which includes the construction of the 3rd bridge to be built in the Bosphorus, has decreased to 3.
In the technical evaluation, 4 of the 3 firms that submitted bids kept the qualification score, while MAPA İnşaat did not get the required qualification score and was out of the tender.
Deputy Director General of Highways and Tender Commission President İhsan Akbıyık and 3. In the meeting where the officials of the firms that bid for the bridge tender participated, the proposal envelopes were opened and the technical adequacy of the firms was evaluated over the 100 score.
Salini-Gülermak Joint Venture, İçtaş İnşaat Sanayi Ticaret AŞ-Astaldi Joint Venture Group and Cengiz İnşaat-Kolin İnşaat-Limak İnşaat-Makyol İnşaat-Kalyon İnşaat Joint Venture Group get the required technical competence score, while MAPA İnşaat ve Ticaret AŞ is below 70 He was out of tender with a qualification score.
In the coming days, the company will be invited to the tender commission to open the offer envelopes.
4 GET OFFER EVALUATING
The tender of the Odayeri-Paşaköy Section of the 'Northern Marmara Motorway Project', which also includes the construction of the 3rd bridge to be built in the Bosphorus, was held on April 20, and the tender Salini-Gülermak Joint Venture, İçtaş İnşaat Sanayi Ticaret AŞ-Astaldi Joint Venture Group, 4 proposals, MAPA İnşaat ve Ticaret AŞ and Cengiz İnşaat-Kolin İnşaat-Limak İnşaat-Makyol İnşaat-Kalyon İnşaat, were taken into consideration.

Source : I www.ntvmsnbc.co

Armin

sohbet

Be the first to comment

Comments