3rd bridge tender of İçtaş-Astaldi

Bids have been opened for the tender for the Odayeri-Paşaköy Section of the Northern Marmara Motorway Project, which includes the construction of the 3rd bridge to be built on the Bosphorus. İçtaş-Astaldi awarded the tender for 10 years, 2 months and 20 days. kazanwas.
Minister of Transport, Maritime Affairs and Communications, Binali Yıldırım, stated that the shortest construction and operation period was 3 years, 10 months and 2 days in the tender for the Odayeri-Paşaköy section of the 'North Marmara Motorway Project', which includes the construction of the 20rd bridge to be built on the Bosphorus, İçtaş İnşaat Sanayi Ticaret AŞ-Astaldi Joint Venture Group awarded and awarded the tender. kazanannounced that he did.
Yildirim said the bridge would be completed within 36 months and the investment would be around 4,5 billion liras.
In the tender held on April 20; 4 proposals, namely Salini-Gülermak Joint Venture, İçtaş İnşaat Sanayi Ticaret AŞ-Astaldi Joint Venture Group, MAPA İnşaat ve Ticaret AŞ and Cengiz İnşaat-Kolin İnşaat-Limak İnşaat-Makyol İnşaat-Kalyon İnşaat were evaluated.
Salini-Gülermak Joint Venture, İçtaş Construction Industry Trade Inc.-Astaldi Joint Venture Group and Cengiz Construction-Kolin Construction-Limak Construction-Makyol Construction-Kalyon Construction Joint Venture Group passed the required 70 score for technical competence, MAPA Construction and Trade Inc. he could not get the score and was left out of the tender.

Similar Ads

Be the first to comment

Comments