TCDD Nusaybin - Cizre - Silopi - Habur Railway Project Preliminary selection applications for survey, project, engineering and consultancy services were collected

Turkish State Railways (TCDD) General
“Nusaybin - Cizre
- Silopi - Habur Railway Surveying, Design, Engineering
Services for the pre-election of the tender X 18 April
2012 collected the day.
According to the information received by the Investments Magazine; in question
The companies that apply for pre-selection for the tender are as follows:
1. Bernard 2. Botek Bosphorus - Atac
3. Emay Engineering 4. The work of Eser Müş. - Aksa
5. Erka-As Project - Koba Müh. 6. Italferr SpA
7. Mescioğlu Engineering 8. Optim Obermeyer
9. Protek Project - Mega Eng. 10. SWS Engineering
11. Turkish Engineering 12. UBM Inc.
13. Yüksel Project
Ref .: Investments Magazine 1074 / 02 April 2012 (APE)

Source: www.yatirimlar.com

Similar Railway News

Similar High Speed ​​Train News

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.