TCDD Nusaybin - Cizre - Silopi - Habur Railway Survey, Project, Engineering and Consultancy Services

The General Directorate of Turkish State Railways (TCDD)
Nusaybin - Cizre - Silopi -
Habur Railway Surveying, Design and Engineering Services Hab
The announcement of the expected tender 27 dated March 2012 Public
Published in the Bulletin of the Procurement Authority.
According to the information received by the Investments Magazine; in question
pre-election last application date 18 April 2012
was declared.
The documents related to the tender, TCDD for 300 lira
General Directorate of Financial Affairs
From the Central Veznesi (Ground Floor Gar / Ankara Tel: 0312
309 05 15) available.
As a result of the pre-election evaluation,
8 candidate offer from among the companies whose competencies are determined
will be invited to give. Duration of work 450 calendar day
was declared.
BID Tender Registration No: 2011 / 207277
Ref .: Investments Magazine 1073 / 26 March 2012 (YD)

Source : I www.yatirimlar.co

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.