Pile-driving for Haliç Metro Transition Bridge in Progress

Halic Metro Bridge
Halic Metro Bridge

The process of driving the main piles of the Haliç Metro Pass Bridge construction, one of the most important stages of the Istanbul Metro, continues.

The piling process of the piles, which were manufactured in Portugal and brought to the Golden Horn in three flights, continues. Steel pipes, whose movements are fixed by moving with two separate cranes, are launched with a crane with a lifting capacity of 800 tons and nailed with a special tool. In the construction where security boats and trailers of various powers operate, 2 excavation barges and 1 pump barge have been established.

When the construction of Haliç Metro Pass Bridge, which is one of the most important stages of Istanbul Metro, is completed, passengers getting on the metro from Hacıosman will be able to reach the Yenikapı transfer station without interruption. Passengers can connect with Marmaray here Kadıköy Kartal, Bakırköy Atatürk Airport or Bağcılar Olympic Village will be able to reach Başakşehir in a short time.

Be the first to comment

Leave a response

Your email address will not be published.


*