İzmir Light Rail System Signalization Projects: İZMİR HRS.II STAGE TUNNEL WORKS AND İZMİR SPOR HATAY STATIONS SUPPLY CONSTRUCTION WORK and İZMİR HRS. 3. STAGE 1. SECTION BORNOVA HOSPITAL - SUPPLEMENTARY CONSTRUCTION BETWEEN EVKA 3 STATIONS (SIGNALIZATION WORKS)
Izmir LRTS, 2000 units and warehouses in service since 10, 11 km. long line.
In addition to the existing system, a total of 3 km in 7,4 separate stages. line will be added. Signalization System Assembly and Test & Commissioning works of the additional lines are carried out within the scope of our company.
Within the scope of signaling systems to be established:
- 85 km. Cable,
- 52 pieces Signal,
- 12 Scissor Motors & Local Control Panels,
- 190 pieces Balis,
- 46 pcs Impedance Bond,
- 116 pcs Isolated Alloy,
- 232 line line circuit,
- Signalization Panels, Rail Circuits, UPS Systems, System Installations, System Integrations,
- Testing and Commissioning
Etc., as are studies.
In our work, work quality and safety is an important issue for us and our aim is to complete our projects ler 0 ler work accident and successfully on time.
BORNOVA - EVKA3 LRTS PROJECT
Bornova - Evka3 extension, about 2,2 km. is a line with an 2 station (University - Evka3).
ÜÇYOL - HATAY LRTS PROJECT
Üçyol - Hatay extension, about 1,7 km. length of 2 station (Izmirspor - Hatay) is a line.
GÖZTEPE - FAHRETTİN ALTAY LRTS PROJECT
Göztepe - Fahrettin Altay extension, about 3,5 km. is a line with 3 station (Göztepe - Polygon - F.Altay).