Tirebolu Erzincan Giresun Railway route has not been determined!

Head of the KTÜ Civil Engineering Department of Transportation Prof.Dr. Dr. In his statement regarding Fazıl Çelik's letter and response to the Prime Minister, he stated that the feasibility studies of Erzincan-Gümüşhane-Trabzon and Erzincan-Gümüşhane-Tirebolu routes are not feasible in terms of cargo and passenger transportation made by a private company.
13.02.2012 / 09: 55

However, it turned out that the issue was not so, and the route through which the railway line would pass was not determined. Minister of Transport, Maritime Affairs and Communications, Binali Yıldırım, in the statement made by the CHP Giresun deputy Selahattin Karaahmetoğlu at the Turkish Grand National Assembly, said that the route to which the railway line will pass is not determined yet.

VEKİL SORDU ANNOUNCES THE MINISTER

9 February 2012 in the Grand National Assembly of Turkey on the agenda of the General Assembly of the question and answer session in Parliament Deputy Chairman Mehmet Saglam manages to Rule 10 MPs entering the system was given a 60-minute talk based on the location. Deputy of Giresun Selahattin Karaahmetoğlu asked the Minister of Transport, Maritime Affairs and Communication Binali Yıldırım about the development and thoughts of both lines in the Gümüşhane Tirebolu and Gümüşhane Trabzon railway line projects. Minister Binali Yıldırım, on the other hand, is still in the study stage via Tirebolu Erzincan Giresun or Trabzon Erzincan railways. Therefore, he answered the question that a route has not been decided yet, it will be the result of studies.

Source: Giresun messenger

Be the first to comment

Leave a response

Your email address will not be published.


*