Public transport system updated

Antalya Metropolitan Municipality, 20 August 2011'da began to implement, but received great criticism of the new public transportation system went to edit.
New transport maps were prepared with information on changes and updates to the public transport system. The new maps prepared by the Metropolitan Municipality were put on public transportation stops and headmen. According to the information on the maps, some routes were changed. 12 trunk line, 38 trunk line, 7 trunking line, 6 Antray tranportation line, 31 trunk line, 1 tranportation line, 1 during winter and 4 tranformation during summer.
In the night lines, due to the lack of passenger density due to the winter, only the KL 08 number one line up to the summer timetable will depart from the Gürsu Transfer Center in a single hour and from the Lara (Güzeloba) Transfer Center in the couple of hours. Antalya Metropolitan Municipality, the last changes and routes in the system with maps and passenger stations were placed in the muhtarlıklarına. The information of the lines passing through that stop will be hanged. Citizen, the expected number of lines from the stop at the stop through the information that can be found in the stops.

Source: CİHAN

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.