Bursa Yenişehir high-speed train contract was signed with YSE-Tepe Partnership

Signed of giant project

Transport, Maritime Affairs and Communications Minister Binali Yildirim, from Ankara to Konya, Ankara to Istanbul from Ankara to Sivas, Bursa, Ankara, Seljuk, Ottoman and a project which is next door to each other by YHT Turkey capital reported that one occurred.

TCDD General Directorate held in the signing ceremony of Bursa High Speed ​​Train (YHT) Project Yildirim, today is a happy day of railroads, stating that they do a new addition to the MDS line.

Bursa-Bilecik line of the first stage of the Bursa-Yenisehir part of which wished to be beneficial to the signing ceremony Lightning, the Republic of Turkey of the railways is as important as independence, began here the independence struggle, they told us that is managed from Ankara Train Station.

After the proclamation of the republic, Ataturk's railways began to mobilize to lift up again expressing the Lightning, 'a lot of investments in the railways. 4 100 3 600 8 1950 134 1950 2003 18 XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX However, after XNUMX neglect, he lived period of oblivion Turkey. In those days XNUMX mileage is made in one year, XNUMX-XNUMX XNUMX miles between the years have been made. It is not the new way, just the connection way, "he said.

160 kilometers speed of the railway with negligence and neglect of the 50 mileage falls below the average speed recording, '' instead of making the road has become a tradition. Tekayyüdat, the road to the deterioration of the road, 'the road is broken down to speed' means. Unfortunately, Turkey has experienced such a period, "he said.

In the 2003, the AK Party government turned railroads into a state policy, noting that the railroads have ceased to be the fate of the country, Yıldırım said.

'This country will draw the railroads, the country's burden, the country will not burden, will contribute to our development to contribute to the 1,5 century-old company to lift up again 1 straight to the government, the 2 straight-facing Ankara-Istanbul High Speed ​​Railway Project to realize the power that is. Sultan Abdülmecit's dream, Sultan Abdülhamit's project has been prepared by Marmaray, the century-old project to be realized in 1860 to realize that the AK Party government is.

Domestic Production

Railways, local trains, locomotives, scissors and high-speed train sets to take steps to realize the production of the Lightning, Ankara subway train sets to be used in the construction of the metropolitan area with the contribution of 51 indigenous additions, he said.

75 is a kilometer line, 20 reported that they do a job equivalent to building a city where a thousand people will live Lightning, '200'e close to the structure of art, 20 is a kilometer of tunnels, 6 km is made of viaduct. So one-third of the tunnel and the viaduct. They have a hard land on each side of Turkey, arduous conditions. What are we gonna do, sit around and cry? 'Hard, immediately done, impossible takes some time', working with understanding, 'he said.

Stating that the speed train lines are spreading to Anatolia step by step, Yıldırım said that they combined the capitals of Anatolian civilizations with each other.

Lightning, from Ankara to Konya, Ankara to Istanbul from Ankara to Sivas, Ankara to Bursa, Seljuk, Ottoman and Turkey, he said that the capital of a neighboring door to each other YHT project of a place.

He said that the railroads carried out politics on the arena of politics, and gave it to the service of the nation, said: ver The signing ceremony to be held today constitutes an important stage of the re-railing movement. Equipping the country with the divided highway in Turkey head to head, dividing roads, we have merged their lives and nation. East of the West, the north of the South with our people have made brothers' he said.

Lightning in every job they do work to facilitate the life of the citizen and they do work by telling the quality of life in the lightning, they see the equivalent of the return and leave the year 9 said.

Yildirim, which states that the country and the people will continue to do the work they need, that the countries that do not put the life in the center of the system are struggling with the crises, the neglect of the people who start overseas and the ongoing crisis in Europe, seeing everything as money and seeing people as a means of making money and that it was revealed that this was an un-executable way.

Expressing that they will continue to make people laugh, Yildirim said that 2012 will bring health, health, peace and peace to the country and the nation.

'Bursa's 58 year longing expires'

TCDD General Manager Süleyman Karaman also gave the following information about the works carried out on the railways in this year:

'We opened Polatlı High Speed ​​Train Station. We laid the foundation for the first stage of Başkentray. We gave Egeray service in İzmir. We laid the foundation of the factory producing High Speed ​​Train sleepers in Sivas. Gaziantep Metropolitan Municipality and the urban rail transportation system Gaziray'ı decided to do together. the first domestic diesel train Anatolia in Turkey have given to flights between İzmir-Tire. World's most cheaply, completed in the shortest possible time, completely made in Turkey have opened the Ankara-Konya High Speed ​​Train route. We laid the foundation of the road that extended Egeray to Torbalı. Turkey train, we launched the project of European Marine Highway. We started High Speed ​​Communication in High Speed ​​Train. We opened the 15 mile tunnel. We built the 5 mile viaduct. We built 260 pieces of art structure, lower and upper pass. The 805 mileage railway has renewed. Ankara-Izmir High Speed ​​Rail Road, we received the bids, 26 company with a record in the history of the rail was broken. 30 December, Bursa High Speed ​​train signature.

2011'ı Bursa YHT with the closure, the year of 2012 will open with Bursa YHT expressing Karaman, Bursa's 58 year-long train stop was said.

Providing information about the Bursa Yenişehir line, Karaman said that the 75 15 units tunnel, 20 kilometers 6 units viaducts, 225 units lower and upper passages and 20 units culverts will be built in 44 kilometers length.

Approximately 10 million 500 thousand cubic meters of excavation and 8 million 200 thousand cubic meters that will perform the filling Karaman, said:

Three stations will be built in Bursa, Gürsu and Yenişehir. We are building the line, passenger and freight transport together with the latest high speed train technology in accordance with the 250 speed per hour. 2,5 will complete the infrastructure within the year, the construction of Yenişehir-Bilecik will begin simultaneously.

Turk-Is General Financial Secretary and General Manager of Rail-Business Ergun Atalay also said that very good work done on the railroads.

Noting that there is a desire of railwaymen Atalay, Turkey's Prime Minister Recep Tayyip Erdogan voiced making its own aircraft, as well as the railwaymen of the advancing train on rails in Turkey he said they want to be in this country.

After the speeches, the joint venture group YSE-Tepe Partnership and Deputy Prime Minister Bülent Arınç, Transport, Maritime and Communications Minister Binali Yıldırım and TCDD General Manager Süleyman Karaman signed a contract.

Source: Olay Newspaper

Art

Sakıp Sabancı Art Awards Ceremony

Sakıp Sabancı Art Awards Ceremony is a special event where creative works are awarded by bringing together the most valuable representatives of art. Discover all the details about the artists and their works at this year's ceremony. [more…]

Be the first to comment

Leave a response

Your email address will not be published.


*