28 km New Tram Line to Izmir

Izmir Metro Saatleri Ticket Prices Stations and Map
Izmir Metro Saatleri Ticket Prices Stations and Map

Preparations have begun for tram projects that will be integrated into the Izmir Metro and Aliağa-Menderes Rail System. Ege City Planning, a company of the Metropolitan Municipality, after the Fahrettin Altay-Alsancak Halkapınar Tram Line Project Tender in April, this time Buca Şirinyer Tınaztepe Campus and Karşıyaka Alaybey carried out the project tender for the trams between Mavişehir. Yüksel Proje A.Ş. carried out all three tram projects. will prepare. The projects, which will be prepared in six months according to the specifications, will be delivered by the New Year at the latest.

EIA report to be received

The Metropolitan will put the Aliağa-Menderes Rail System into service in October 2010, the İzmir Metro Bornova line in February-March 2011, and the entire Üçyol-Üçkuyular line in June-July 2011. The tender for the construction of the tram lines will be made after the positive report of the EIA (Environmental Impact Assessment) and the permission of the DLH (General Directorate of Railways, Ports and Airports Constructions) are obtained. Tenders will be held at the end of 2011, primarily on the Fahrettin Altay Alsancak Halkapınar line. tram lines; It will work integrated with metro, suburban line, bus and sea transportation.

Here itineraries

Fahrettin Altay-Alsancak-Halkapınar Line: It will be integrated with the metro project between Aliağa-Menderes Rail System and Üçkuyular-Bornova. 13 miles long. Mustafa Kemal Beach Boulevard, Cumhuriyet Square, Halkapınar Metro Station.

Buca Line: Aliağa-Menderes suburb line will start from Şirinyer Station. Arriving and departing from the existing line is divided into two. It will reach the Agile Square. The line that will continue from Özmen Street is 61 behind Hasan Ağa Garden. He'il be on the street. 5 miles long.

Karşıyaka Line: Alaybey'den double-track line starting from the coast will reach Bostanlı Pier. After that the route will be finalized after the tender. It will either continue from the beach or enter Cengiz Topel Street perpendicular to the sea to reach Cahar Dudayev Boulevard. Mavişehir Station will end. Length 10 kilometers.

Izmir Metro and Tram Map

Be the first to comment

Leave a response

Your email address will not be published.


*