Gaziantep Rail 1. Etap Construction Tender

Borege Construction won the tender organized by the Metropolitan Municipality for the construction works of the light rail system. The lowest bid in the tender was 16 million YTL.

Borege construction won the tender organized by the Metropolitan Municipality for the construction of the light rail system. Hiperbol İnşaat made the lowest bid in the tender with 16 million 937 thousand YTL. Borege's proposal was 17 million 343 thousand YTL.

The tender for "light rail system 24st stage construction" by the Metropolitan Municipality was concluded. "Borege Construction Industry and Trade Limited Company" won the tender with a price of 1 million 17 thousand 343 YTL. In the tender in which 720 companies participated, Borege İnşaat made the second lowest bid.

While the total 4 firm was bidding for the tender, the commission chairman considered all of these offers as a result of the evaluation. 9 2008 9 2009 XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX

OFFER IN CONSTRUCTION TENDER

Hiperbol Construction: 16 million 937 thousand YTL
Borege Construction: 17 million 343 thousand YTL
Building Center: 27 million 369 thousand thousand
Laugh: 37 million 507 thousand

Source: Özen Technical Consultancy

Be the first to comment

Leave a response

Your email address will not be published.


*