İzmir Suburban Management Protocol approved by YPK

It's time to open a new title with the introduction of EGERAY. The old title will be locked and our new title will be auspicious. From now on, all the events and news about our flights will be published here and discussed ...

İZBAN WEB SITE: http://www.izban.com.tr

STATIONS:
North Axis
Aliağa - Biçerova - Hatundere - Menemen - Egekent 2 - Ulukent - Egekent 1 - Atasanayi - Çiğli - Mavişehir - Şemikler - Demirköprü - Nergiz - Karşıyaka - Alaybey - Naldöken - Turan - Bayraklı - Salhane

South Axis
Halkapınar - Alsancak - Kemer - Şirinyer - Running - İnkılap - District Garage - Esbaş - Gaziemir - Sarnıç - A.Menderes Airport - Cumaovası

STATION PHOTOS: İZM »İZBAN Stations Photos / Opinions

PROJECT DEVELOPMENT: İZM »B1.06 - Aliağa-Menderes Rail System Project (Egeray) opens

30 AUGUST 2010 TRIAL LOVE: IZM »Halkapinar-Cumaovasi Rail System Line Is Opening

AIMED EXTENSIONS: BERGAMA in the North, TORBALI in the South (TEPEKÖY) - SELÇUK

TRANSFER CENTERS:
* ALIAGA TRANSFER CENTER (To be added)
* BİÇEROVA TRANSFER CENTER (To be added)
* HATUNDERE TRANSFER CENTER (To be added)
* MENEMEN TRANSMISSION CENTER (to be added)
* ULUKENT TRANSFER CENTER (To be added)
* EGEKENT TRANSFER CENTER (to be added)
* ÇİĞLİ TRANSFER CENTER (To be added)
* MAVİŞEHİR TRANSFER CENTER
* SALHANE TRANSFER CENTER
* HALKAPINAR TRANSFER CENTER (to be added)
* KEMER TRANSFER CENTER
* SIRINYER TRANSFER CENTER
* GAZİEMİR SEMT GARAGE (To be added)
* ESBAS TRANSFER CENTER (to be added)
* SARNICH TRANSFER CENTER (to be added)
* CUMAOVASI TRANSFER CENTER (to be added)

CONTEMPORARY SOLUTION FOR URBAN URBAN COLLECTION

  • İzmir, Modern Management System Provided with Central Government, Public Enterprise and Local Administration
  • Contemporary Solution to İzmir Urban Public Transport: EGERAY İzmir

The İZBAN Department of the EGERAY Project was launched on March 6, 2011 at 15.30 at a ceremony held at the historical Alsancak Station. İZBAN, connecting Aliağa and Menderes, was put into service by Prime Minister Recep Tayyip Erdoğan and Republican People's Party Chairman Mr. Kemal Kılıçdaroğlu.

İzmir, the third largest city of our country, has signed a giant project with the cooperation of Ministry of Transport, TCDD and İzmir Metropolitan Municipality in order to produce modern solutions for urban mass transportation.

Within the framework of the project TCDD; by subtracting the subway line on the double line, establishing electrification, signaling and telecommunication facilities on the dual-line 79 km Aliağa-Menemen-Basmane and Alsancak-Cumaovası line; substructure deficiencies; took the line under the line; Egekent rebuilt 2 and Ulukent stations at the subway standard.

TCDD, nearly 5 closed this segment to passenger and freight transportation throughout the year.

Izmir Metropolitan Municipality also built two tunnels, 5.2 stations, 25 station reconstruction, 25 highway and overpass and maintenance and repair centers.

To be responsible for the operation of the suburban system, TCDD and İzmir Metropolitan Municipality established İZBAN A.Ş.

For the project, 99 series vehicle consisting of 33 wagons was purchased from abroad.

Turkey, which is linked to the airport's longest commuter system İZBAN; Starting from Aliağa from the north, Menemen, Çiğli, Karşıyaka, Alsancak, Şirinyer, Gaziemir, Adnan Menderes Airport and the total 31 station to Cumaovası 550 station will serve a thousand passengers a day.

Metro system and Alsancak-Aliağa 60 minutes, Alsancak-Cumaovası 26 minutes, including the total 86 minutes.

As it is known, the basis of the project is at 3 Mart 2006 Karşıyakawas thrown.

The expansion of the project to other cultural and tourism centers was also on the agenda.

Historical Process of the Ederay System

27.07.1999 signed a Protocol on Joint Working with Izmir Metropolitan Municipality.

In May of 2004, Alsancak-Cumaovası Basmane-Menemen-Aliağa Signaling-Telecommunications and Electrification Project was completed.

11.10.2004 has signed a Memorandum of Understanding to enable the co-operation project.

In 2004, the Municipality has started the construction of the overpasses and finished in 2010.

26.03.2005 signed the için Izmir Commuter Management Protocol B in order to clarify the obligations of the parties.

The protocol in question:

  • MUNICIPALITY and TCDD to establish a joint-stock company that will enable the suburban operation to be jointly executed,
  • The company will be established by the parties, Aliağa-Alsancak and Alsancak-Cumaovası lines for the 49 year to perform sub-city operations, includes the main headings,
  • Equity of joint stock companies and participation of the Company in terms of TCDD are the main headings of the parties.

  • On the 06.06.2005, İzmir Suburban Management Protocol was approved by YPK.

    Armin

    sohbet

      Be the first to comment

      Comments