Çiğli Tram Line Construction Work Prequalification Tender Result

cigli tram line construction work tender result
cigli tram line construction work tender result

Çiğli Tram Line Construction Work Prequalification Tender Result: Tender, Approximately 12 km long 15-station tram line and stops, transformer buildings (underground / above), viaduct, mechanical, electrical works and electromechanical works, Konak tram in operation. This includes the extension of the platform lengths of the stops. The duration of the work is 730 (seven hundred thirty) calendar days from the place delivery.

Izmir Metropolitan Municipality Rail System Department 2020 companies applied for prequalification for the tender number 342727/17. These companies are listed as follows:

  1. Alsim Alarko
  2. Kolin Construction - Ederay Construction
  3. Unitek İnşaat - YDA Construction
  4. ÖZKA Construction - Dillingham Contruction
  5. Ermit - En-Ez Construction
  6. Birth
  7. Building Center
  8. Makyol
  9. Şenbay Mining - Özgün Yapı
  10. Nurol Construction
  11. Cengiz Construction
  12. Özkar Construction
  13. Dido-ray - Araz Energy
  14. Gülermak
  15. IC İçtac
  16. Kiev Metrobud - Barankaya Construction
  17. Pers Building - Astro Superstructure

Information About Çiğli Tram

The first stage of Çiğli Tramway, Karşıyaka It starts from Çevreyolu Station and extends to Ataşehir, Çiğli Istasyonaltı, Çiğli İZBAN stop and Çiğli Regional Training Hospital with a connecting bridge. This stage is 3 meters long and consists of four stops.

The second stage starts from Ataşehir Mahallesi and passes through Atatürk Organized Industrial Zone, Katip Çelebi University and Ata Sanayi and ends at Çiğli Regional Training Hospital. This stage with a total length of 7 meters consists of 500 stops.

First stage of cigli tram
First stage of cigli tram

There will be a total of 14 stations on the Çiğli Tram Line

The line will consist of 14 stations. The line width will be 7,2 meters. The major part of the route was planned as a double line, passing through the central refuges of the existing streets and roads. The first phase of the project Karşıyaka Starting from Çevreyolu Station, it will cover the Ataşehir and Çiğli İstasyonaltı neighborhoods, Çiğli İZBAN Station and Çiğli Regional Training Hospital with the connection bridge. There will be four stations in this 3-meter-long stage.

The second stage will start from Ataşehir Mahallesi and follow the Ata Sanayi Route, Katip Çelebi University, Ata Sanayi route and end at Çiğli Regional Training Hospital. There will be 7 stations in this stage, which is 500 meters long.

Çiğli Tram Route

Çiğli Tram Line to be Completed in 2,5 Years

Karşıyaka and connection with İZBAN Çiğli Tram Line will be completed in approximately 2,5 years. Line, Karşıyaka It will be a continuation of the tram. In order to ensure the integration of the line with İZBAN, approximately 300 meters of connection bridge will be constructed that will cross the ring road. In addition to the tram line, there will be pedestrian and bicycle routes on the bridge.

There will be tram stations in front of Çiğli Regional Training Hospital and İzmir Katip Çelebi University. The line will also pass through Çiğli Ata Sanayi and Atatürk Organized Industrial Zone (AOSB). Citizens who take the tram from Alaybey will be able to travel to Çiğli without interruption. Thus, vehicle traffic will be reduced.

Izmir Tram Map

Comment

  1. If the building takes the center or laughs, we're safe.

Leave a response

Your email address will not be published.


*